1 / 20

TEKNIK PERMESINAN KAPAL II

TEKNIK PERMESINAN KAPAL II. ME091313 ( 4 SKS) Jurusan Teknik Sistem Perkapalan ITS Surabaya. Ship Design. EFFECTIVE it must meet the owner's needs as laid down in the ship requirements.

molimo
Download Presentation

TEKNIK PERMESINAN KAPAL II

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TEKNIK PERMESINAN KAPAL II ME091313 ( 4 SKS) Jurusan Teknik Sistem Perkapalan ITS Surabaya

  2. Ship Design • EFFECTIVE it must meet the owner's needs as laid down in the ship requirements. (Capacity and size; Cargo handling; Influence of nature of goods carried; Speed; Maneuverability; Machinery etc.) • EFFICIENT It must carry out its functions reliably and economically. (Economy; Availability) • SAFE It must be able to operate under the expected conditions without incident and to survive more extreme conditions and accidents within an agreed level of risk.

  3. The Design Process • FEASIBILITY STUDIES The aim at the feasibility stage is to confirm that a design to meet the requirements is possible with the existing technology and to a size and cost likely to be acceptable to the owner. • CONTRACT DESIGN Once the owner has agreed to the general size and character of the ship more detailed designing can go on. The contract design, as its name implies, is produced to a level that it can be used to order the ship from a shipbuilder, or for a contract price to be quoted. At this stage all major features of the ship will be fixed. • FULL DESIGN The detailing of the design can now proceed leading to the drawings, which are needed by the production department to build the ship.

  4. CRITERIA FOR CHOOSING THE MAIN ENGINE • Required horsepower • Weight • Space • Capital cost • Running costs • The ship’s requirement for electrical power and heat • Reliability and maintainability • The ship’s requirement for maneuvering ability and/or for slow-speed operation • Ease of installation • Vibration • Noise and other signatures • Availability

  5. Required Horsepower EHP : Effective Horse Power THP : Thrust Horse Power DHP : Delivered Horse Power SHP : Shaft Horse Power BHP : Brake Horse Power EHP : the power we would have to use to tow the ship withoutpropulsive system Vs Vs EHP T : Thrust (Gaya Dorong) RT THP DHP THP : the power produced by the propeller’s thrust SHP BHP

  6. THP DHP SHP BHP Required Horsepower EHP = Vs x RT THP = VA x T PC= EHP / DHP Propulsive Coefficient EHP : kW Vs : m/s RT : kN s = DHP / SHP Shaft Efficiency Vs Vs G = SHP / BHP Gear Efficiency = H xO xR PC G s EHP RT

  7. Required Horsepower • Type of propulsion • Number of propulsion

  8. Weight & Space As far as the main engines are concerned space and weight generally go together, but if a trade-off between weight and space is possible, then ships designed on a deadweight basis should be fitted with the lighter machinery, even if this takes more space, whilst those designed on a volume basis should be fitted with the less bulky machinery even if this is heavier. In the design of warships, planning craft and catamarans, the need for a high speed from a relatively small ship makes the power/weight ratio a matter of vital importance. On warships space, like weight, is at a premium and the power/volume ratio is very important.

  9. Capital and Running Cost • The cost of the main engine and the systems • The most important item of running costs is the annual fuel bill Two fundamentally different ways of minimizing expenditure on fuel: (i) by fitting as fuel efficient an engine as possible even if this requires a relatively expensive fuel; or (ii) by the use of machinery which can burn a cheap fuel even if its specific consumption is comparatively high

  10. The ship’s requirement for electrical power and heat Because the main engine will generally be able to burn a cheaper fuel than is required by the generators, the use of the main engine(s) to provide electrical energy and/or heat for engine auxiliary plant and hotel services via shaft driven alternator(s) and exhaust gas boiler(s) respectively can have an important influence on running costs.

  11. ALTERNATIVE MAIN ENGINE TYPES • Diesel Engine • Gas Turbine • Steam Turbine

  12. Diesel Engine

  13. Low-speed diesel machinery arrangement

  14. Medium-speed diesel machinery arrangement

  15. COGOG • CODOG • CODAG • CODAG

More Related