An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. O&M Fundamentals for PV Activities, frequencies, actors

  2. O&M-related Characteristics of PV • Modules: high reliability lasting 20 years or more • O&M Costs • Non-tracking: $12/kW/yr or .17% of capital cost • Single-axis tracking: .35% of capital cost • $40/kW/yr including inverter replacement • Planned maintenance: 0.04-0.08% of initial cost per year • Unplanned maintenance: 0.01-0.22% of initial cost per year • Most panels protected by tempered glass • Cleaning is possible and can be elected depending on site conditions • Most rely on rain to keep panels clean

  3. O&M Tasks for Site Staff: Ongoing • Observe inverter front panel indicators when sun is up – generating power? Typical of conditions? Sudden changes? • Maintain log of cumulative energy delivery (kWh to date) and chart against the date. • Document all O&M activities in workbook available to all service personnel.

  4. O&M Tasks for Site Staff: Annually • Walkthrough arrays for panel and racking damage. Report for warranty replacement. • Check position of disconnect switches. • Inspect/maintain wiring, insulation, protective materials. • Check tightness of mounting clamps. Reinstall loose modules. • Check for shading (new objects, vegetation) and remove. Remove debris from behind collectors and from gutters. • Clean modules with water or mild dishwashing detergent – no brushes, solvents, abrasives, harsh detergents. • Check hardware for corrosion, remove rust, repaint as needed. • Check inside combiner boxes for blown fuses and loose connections. Infrared camera useful for checking connections. • Check for signs of intrusion by pests: insects, rodents. Remove nests from electrical boxes or proximity of array.

  5. O&M Tasks for Solar or O&M Contractor At intervals according to site conditions • Take simultaneous readings to compare balance-of-system efficiency with original efficiency of system as function of • Incident sunlight • Temperature • Energy output • Replace air filters on air-cooled equip. such as inverter • Retorque all electrical connections • Replace corroded electrical boxes • Repair / replace damaged to racks and modules • Replace failed fuses and other components • Install upgrades to inverter firmware and that of data acquisition and monitoring systems.

  6. Unscheduled Maintenance: component failure • Complete systems: often warranted by installer for one year • Modules (rare, 6% of unscheduled maintenance costs) • theft / vandalism • 20 or 25 year warranty typical • Inverters (more common, 59% of unscheduled maintenance costs) • Much lower than any other type generator • Recent models much more reliable • 10 year warranty now typical

  7. Step 5: O&M– Outputs Photo from Henry Price, NREL 14952 • Ensure responsible party carries out O&M/R&R* • Measuring and tracking success • Correlation with business plan and strategic energy plan • Contract compliance • Reporting of generation  Met or exceeded energy and financial performance *Esp. if owner