1 / 58

FIN 468: Intermediate Corporate Finance

FIN 468: Intermediate Corporate Finance. Topic 8–Cost of Capital Larry Schrenk, Instructor. Topics. Excel: Linear Regression Project Review Cost of Capital Equity Debt Preferred Shares. Excel: Linear Regression. Excel Features: Linear Regression.

monet
Download Presentation

FIN 468: Intermediate Corporate Finance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FIN 468: Intermediate Corporate Finance Topic 8–Cost of Capital Larry Schrenk, Instructor

  2. Topics • Excel: Linear Regression • Project Review • Cost of Capital • Equity • Debt • Preferred Shares

  3. Excel: Linear Regression

  4. Excel Features: Linear Regression • Linear regression finds the line that best fits a series of points. In finance, it is often used to find the beta (b) of a firm’s equity. • In our example, we shall find the beta of MMM using the S&P 500 as a proxy for the market. Since we want to know the sensitivity of the return on MMM to changes in the return on the S&P 500, the return on MMM is the dependent variable (y axis) and the return on the S&P 500 the independent variable (x-axis).

  5. Excel Features: Linear Regression 1) You need to have the returns of the assets arranged in columns:

  6. Excel Features: Linear Regression 2) Click on Data Analysis under the ‘Tools’ drop-down menu to open the Data Analysis window. Then select ‘Regression’ and click on ‘OK’.

  7. Excel Features: Linear Regression 3) The Regression window will appear.

  8. Excel Features: Linear Regression 4) In the regression window, input the cells for the y variable (MMM) and the x variable (S&P 500). Click on the ‘Line Fit Plots’ box and click on ‘OK’.

  9. Excel Features: Linear Regression 5) A new worksheet will appear with the results and a graph.

  10. Excel Features: Linear Regression 6) The blue squares are data points and the pink squares are the corresponding points on the best-fit line.

  11. Excel Features: Linear Regression 7) Here is the same graph with a dashed line drawn though the points.

  12. Excel Features: Linear Regression 8) The summary statistics provide a wealth of information about the regression. In particular the beta is the coefficient of the x variable.

  13. Project Review

  14. Project Review I • Provide a brief discussion of the company’s products, markets, and competitors. • Provide a brief discussion of the top management, their qualifications, experience, and how long they have been with the company. Are any of the managers considered a key person that would hurt the firm if they left? • Provide a brief discussion of any risks the firm may face such as competitive pressure, product obsolescence, lawsuits etc.

  15. Project Review II • Perform a ratio analysis of at least the last 3 years. • Comparative industry • Trends over time • Explain major changes and deviations from industry • Create a pro-forma 5 year income forecast • Calculate FCF over next five years and a terminal value • Estimate firm’s cost of equity capital using one or more of the following methods: • CAPM • Discounted Cash Flow • Own-Bond-Yield-Plus-Risk-Premium

  16. Cost of Capital

  17. Cost of Capital Rate of return that the suppliers of capital – bondholders and stockholders require as compensation for their contributions of capital

  18. Leverage and Marginal Cost As firms take on more debt, financial leverage increases increasing the riskiness of the firm and causing lenders to require a greater return Additional debt may therefore increase cost of capital The marginal cost is the cost to raise the additional funds for the potential investment project

  19. Firm vs. Project Cost of Capital • Cost of capital for entire company • Important for firm/security valuation • Cost of capital for a specific project • WACC must be adjusted for the riskiness of the project

  20. Target Weights Assume current capital structure is correct Estimate capital structure based on historical trends Use average of comparable companies capital structure

  21. The numerator focuses on project cash flows. Reflect the opportunity costs of the firm’s investors. The denominator should: Reflect the project’s risk. • Be derived from market data. Choosing the Right Discount Rate The denominator is the discount rate.

  22. Cost of Equity Capital

  23. Where Do We Stand? • Earlier chapters on capital budgeting focused on the appropriate size and timing of cash flows. • This chapter discusses the appropriate discount rate when cash flows are risky.

  24. Asset Betas and Project Discount Rates • When a firm uses no leverage, its equity beta equals its asset beta. • An unlevered beta simply tells us how risky the equity of a company might be if it used no leverage at all.

  25. Finding the Right Discount Rate • When an all-equity firm invests in an asset similar to its existing assets, the cost of equity is the appropriate discount rate to use in NPV calculations. • When a firm with both debt and equity invests in an asset similar to its existing assets, the WACC is the appropriate discount rate to use in NPV calculations.

  26. Risk Premium • Beta The Cost of Equity Capital • From the firm’s perspective, the expected return is the Cost of Equity Capital: • To estimate a firm’s cost of equity capital, we need to know three things: • Risk Free Raterrf

  27. Example • Suppose the stock of Stansfield Enterprises, a publisher of PowerPoint presentations, has a beta of 2.5. The firm is 100 percent equity financed. • Assume a risk-free rate of 5 percent and a market risk premium of 10 percent. • What is the appropriate discount rate for an expansion of this firm?

  28. Project Project b Project’s Estimated Cash Flows Next Year IRR NPV at 30% A 2.5 $150 50% $15.38 B 2.5 $130 30% $0 C 2.5 $110 10% -$15.38 Example Suppose Stansfield Enterprises is evaluating the following independent projects. Each costs $100 and lasts one year.

  29. A 30% B C 2.5 Using the Security Market Line An all-equity firm should accept projects whose IRRs exceed the cost of equity capital and reject projects whose IRRs fall short of the cost of capital. Good project Project IRR Bad project 5% Firm’s risk (beta)

  30. Estimation of Beta Market Portfolio - Portfolio of all assets in the market. In practice, a broad stock market index, such as the S&P Composite, is used to represent or proxy the market. Beta - Sensitivity of a stock’s return to the return on the market portfolio.

  31. Estimation of Beta • Problems • Betas may vary over time. • The sample size may be inadequate. • Betas are influenced by changing financial leverage and business risk. • Solutions • Problems 1 and 2 can be moderated by more sophisticated statistical techniques. • Problem 3 can be lessened by adjusting for changes in business and financial risk. • Look at average beta estimates of comparable firms in the industry.

  32. Stability of Beta • Most analysts argue that betas are generally stable for firms remaining in the same industry. • That’s not to say that a firm’s beta can’t change due to… • Changes in production • Changes in operating leverage • Deregulation • Changes in financial leverage

  33. Using an Industry Beta • It is frequently argued that one can better estimate a firm’s beta by involving the whole industry. • If you believe that the operations of the firm are similar to the operations of the rest of the industry, you should use the industry beta. • If you believe that the operations of the firm are fundamentally different from the operations of the rest of the industry, you should use the firm’s beta. • Don’t forget about adjustments for financial leverage.

  34. Determinants of Beta • Business Risk • Cyclicality of Revenues • Operating Leverage • Financial Risk • Financial Leverage

  35. Cyclicality of Revenues • Highly cyclical stocks have higher betas. • Empirical evidence suggests that retailers and automotive firms fluctuate with the business cycle. • Transportation firms and utilities are less dependent upon the business cycle. • Note that cyclicality is not the same as variability–stocks with high standard deviations need not have high betas. • Movie studios have revenues that are variable, depending upon whether they produce “hits” or “flops,” but their revenues may not especially dependent upon the business cycle.

  36. Operating Leverage • The degree of operating leverage measures how sensitive a firm (or project) is to its fixed costs. • Operating leverage increases as fixed costs rise and variable costs fall. • Operating leverage magnifies the effect of cyclicality on beta. • The degree of operating leverage is given by:

  37. Total costs Fixed costs Operating Leverage  EBIT Total costs $  Sales Fixed costs Sales Operating leverage increases as fixed costs rise and variable costs fall.

  38. Financial Leverage and Beta • Operating leverage refers to the sensitivity to the firm’s fixed costs of production. • Financial leverage is the sensitivity to a firm’s fixed costs of financing. • The relationship: • Financial leverage always increases the equity beta relative to the asset beta.

  39. 1 bAsset = 0.90 = × bEquity 1 + 1 Example Consider Grand Sport, Inc., which is currently all-equity financed and has a beta of 0.90. The firm has decided to lever up to a capital structure of 1 part debt to 1 part equity. Since the firm will remain in the same industry, its asset beta should remain 0.90. However, assuming a zero beta for its debt, its equity beta would become twice as large: bEquity= 2 × 0.90 = 1.80

  40. The Firm versus the Project • Any project’s cost of capital depends on the use to which the capital is being put–not the source. • Therefore, it depends on the risk of the project and not the risk of the firm.

  41. Incorrectly accepted negative NPV projects Incorrectly rejected positive NPV projects rf bFIRM Capital Budgeting & Project Risk A firm that uses one discount rate for all projects may over time increase the risk of the firm while decreasing its value. Why? Project IRR The SML can tell us why: Hurdle rate Firm’s risk (beta)

  42. Capital Budgeting & Project Risk Suppose the Conglomerate Company has a cost of capital, based on the CAPM, of 17%. The risk-free rate is 4%, the market risk premium is 10%, and the firm’s beta is 1.3. 17% = 4% + 1.3 × 10% This is a breakdown of the company’s investment projects: 1/3 Automotive Retailer b = 2.0 1/3 Computer Hard Drive Manufacturer b = 1.3 1/3 Electric Utility b = 0.6 average b of assets = 1.3 When evaluating a new electrical generation investment, which cost of capital should be used?

  43. Capital Budgeting & Project Risk SML 24% Investments in hard drives or auto retailing should have higher discount rates. Project IRR 17% 10% Project’s risk (b) 0.6 1.3 2.0 r = 4% + 0.6×(14% – 4% ) = 10% 10% reflects the opportunity cost of capital on an investment in electrical generation, given the unique risk of the project.

  44. Using Peers to Find Cost of Equity • Two approaches • Find all equity peers • Delevering betas

  45. Beta of Debt • Possibilities • 0 • 0.1-0.3 • Use debt ratio and beta of debt to delever • Find bAssetfrom bEquity

  46. Delevering Betas • Data • bEquity= 1.1 • Equity = $2,000,000 • Debt = $1,000,000 • Assume bEquity= 0.1

  47. Cost of Equity • Capital Asset Pricing Model (CAPM) • Peer Comparison • Dividend discount model approach • Bond yield plus risk premium approach

  48. Cost of Debt

  49. The Cost of Capital with Debt • The Weighted Average Cost of Capital is given by: • Because interest expense is deductable, we multiply the last term by (1 –tC).

  50. Example: International Paper • First, we estimate the cost of equity and the cost of debt. • We estimate an equity beta to estimate the cost of equity. • We can often estimate the cost of debt by observing the return on the firm’s debt. • Second, we determine the WACC by weighting these two costs appropriately.

More Related