An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ACTIONABLE POINTS FOR ENGINEERS OF RWS&S BY S.LaxmiPati, CE-ii RWESS

  2. ACTIONABLE POINTS FOR ENGINEERS RWS&S Updating the list of running and defunct tube wells. Update the list of Tube wells in Anganwadi and School. Updating the IMIS list( Basic information- B-21 ). Preparation of Tube well ID. Preparation of master register of tube wells and SEM ( As per Form-I and II ) Painting and numbering of tube wells ( Preparation of Stencil)

  3. ACTIONABLE POINTS FOR ENGINEERS RWS&S 7. Daily progress report an painting and numbering. 8. Updating of date base of SEM. 9. Training of existing SEMs. 10. Progress report on SEM training ( fortnightly) 11. Issue of ID card to SEMs

  4. ACTIONABLE POINTS FOR ENGINEERS RWS&S 12. Display of information board on OPSDA 2012 in the office of the JE-II. 13. Assessment of man power ( SEM / Mobile Team ) 14. Selection and deployment of balance SEM as per requirement. 15. Assessment of spare parts monthly/ yearly • Fast moving parts with SEM. • Slow moving parts with Mobile Team. 16. Procurement of Spares / Tools

  5. ACTIONABLE POINTS FOR ENGINEERS RWS&S 17. Requirement of Mobile Van. 18. One Mobile van to be deployed on regular basis with J.E-II 19. Addition Vehicle can be deployed in case of requirement like Flood/ Cyclone/ Summer/ Others. 20. Monthly meeting of SEM ( Record keeping as per format form-III to VI) by J.E.II/I 21. Training of New SEM 22. WPR/FPR/MPR for OPSDA, 2012.