PHASE-II. PHASE-I. In Progress. All 3 Packages (EPC) are awarded and works are in progress Utilisation : 20 TMC Total Ayacut : 45,000 Acs. Target Date for completion : 24 Months. Estimated cost : 124.00 Crs . Utilisation : 12.499 TMC Ayacut : 62, 280 Acs
E N D
PHASE-II PHASE-I In Progress • All 3 Packages (EPC) are awarded and works are in progress • Utilisation : 20 TMC • Total Ayacut : 45,000 Acs. • Target Date for completion : 24 Months. • Estimated cost : 124.00 Crs. • Utilisation : 12.499 TMC • Ayacut : 62, 280 Acs • Funding : AIBP • I.P created 6/05 : 40,000 Acs • I.P to be created by 6/06 : 22,280 Acs • Target Date for completion : 6/2006 VAMSADHARA PROJECT (Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs) STAGE-II STAGE-I • Completed in 1977 • Ayacut 1,48,230 Acs. • Main Left Canal : 104.24Kms.
PROGRESS (6/2006) COMPLETED VAMSADHARA PROJECT RIGHT MAIN CANAL (PHASE-I OF STAGE-II) Project to be completed in 2 years period Ayacut = 14,231 Acres GOTTA BARRAGE (Stage-I) ( STAGE – I COMPLETED) LEFT MAIN CANAL (LMC) Utilisation = 17.841 TMC KM 104.24 VAMSADHARA RIVER VAMSADHARA RIVER RESERVOIR ( Phase-I of Stage – II) RIGHT MAIN CANAL (RMC) KM 52.973 KM 0.00 KM 37 HEAD REGULATOR CM & CD WORKS, DISTRIBUTARIES, FIELD CHANNELS • Head Regulator :Completed • Right Main Canal • Length : 52.973 KM • Completed : 37 KM • Progress (Balance) : 15.973 KM • Distributaries : 40 Nos. • Completed : 18 Nos. • Progress : 22 Nos. • TARGET DATE OF COMPLETION : 7/2006
VAMSADHARA PROJECT RIGHT MAIN CANAL (PHASE-I OF STAGE-II) Project to be completed in 2 years period
GOTTA BARRAGE VAMSADHARA RIVER Link Canal (4.053 Km) (Hiramandalam Reservoir to Gotta Barrage) Stage – II, Phase – II Stage – II, Phase – II SIDE WEIR (300M) KATRAGADA (V) 8000 C/s HIGH LEVEL CANAL CANAL FLOOD FLOW 30 Km 34.10 Km HEAD REGULATOR SINGIDI BALANCING RESERVOIR (Cap : 0.069 TMC) PARAPURAM BALANCIG RESERVOIR (Cap: 0.606TMC) HIRAMANDALAM BALANCIG RESERVOIR 19.05 TMC 5000 Acres FFC (34.100 Km) Ayacut 20,000 Acres VAMSADHARA FLOOD FLOW CANAL PHASE II OF STAGE-II Ayacut : 20,000 acres To Irrigate 1) Stage-II Phase-II (FFC) 45,000 Ac. 2) Supplementing 5 TMC from Hiramandalam Balancing Reservoir to Gotta Barrage 3) To supplement to right main canal
VAMSADHARA PROJECT STAGE-II, PHASE-II (EPC SYSTEM) CATEGORY- II TOTAL: 492.82 Crs.
VAMSADHARA PROJECT Package No.87/CA-II : Construction of side channel and excavation of Flood Flow Canal from Km.0.00 to Km.14.205 Name of the Contractor : M/s. Harvins Constructions Agreement Amount : Rs. 72.64 Crs. Agreement Date : 24-03-2005 Period of Completion : 2 Years (8 Mile stones) Date of Completion : 3/2007
VAMSADHARA PROJECT Package No.88/CA-II : Excavation of Flood Flow Canal from Km.14.205 to Km 34.10 and lining for a length of 15.44Kms and construction of Balancing Reservoir at Parapuram (Village) Name of the Contractor : M/s. Srinivasa Const. Pvt.Ltd. Agreement Amount : Rs. 66.68 Crs. Agreement Date : 17-03-2005 Period of Completion : 2 Years(8 Mile Stones) Date of Completion : 3/2007
VAMSADHARA PROJECT Hiramandal Reservoir : Formation of Earth Dam for Hiramandal Reservoir to store a capacity of 19.05 TMC of water. Name of the Contractor : M/s. Soma-Patel ASI-JV. Agreement Amount : Rs. 353.504 Crs. Agreement Date : 31-03-2005 Period of Completion : 3 Years (12 Mile Stones) Date of Completion : 3/2008