1 / 40

District Water Management Agency

Gram panchayat irrigation plan (GPIP). Kammuru (GP) Kudair (M) Ananthapuramu District. District Water Management Agency. GP Details. Anganwadi Centre : 1 Primary School : 1 Panchyath building : 1 Post office : 1 Cooperative Society : 1 OHead tank : 1 RO Plant : 1 Tanks : 1

mooney
Download Presentation

District Water Management Agency

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gram panchayat irrigation plan (GPIP) Kammuru (GP) Kudair (M) Ananthapuramu District District Water Management Agency

  2. GP Details Anganwadi Centre : 1 Primary School : 1 Panchyath building : 1 Post office : 1 Cooperative Society : 1 OHead tank : 1 RO Plant : 1 Tanks : 1 Borewells : 195 (Funct : 119 Non Fun : 76) Total Area : 1570.95 Cropped Area : 1180.55 Rainfed Area: 1081.95 Irrigated Area : 98.60 Common Land : 160.00 Grazing Land : 25.00 Uncultivable waste : 4.40 Forest : 201 Marginal & Small Farmers : 93 Big Farmers : 319 Land Less : 188 No.of HHs migrated : 2 Milch Animals : 438 Bullock : 129 Hebuffaloes : 127 Sheep : 2530 Goat : 607 Milk production : (liters) Cows : 2 ltr per animal /day Buffaloes : 3 ltr /animal /day House Holds : 600 Job cards issued : 600 Total : 1909 Male : 994 Female : 915 Literacy % (Male : Female) 54 : 40 SC : 441 ST : 07 BC : 1084 Others : 377 Farming & Live Stock details Land (Ha) Infrastructure Population KAMMURU GRAMPANCHYAT

  3. Kammuru IWMP Details

  4. NRM WORKS DONE UNDER IWMP in Kammuru GP

  5. NRM WORKS DONE UNDER MGNREGS in Kammuru GP

  6. Existing Water Resources in Kammur GP

  7. Action Plan to achieve water sufficiency

  8. Water Budget Water availability Water deficit 1 Water receipt KAMMURU GP 2 3

  9. WATER Budget Rainfall receipt : Village area (Ha) = 1570.95 Average rainfall = 515 mm Annual rainfall = 1570.95 * 515 /1000 809.04 Ha-m Rainfall usage : 1. Ground water (9%) = 809.04*9/100 = 72.81 Ha-m 2. Run off (40%) = 809.04*40/100 = 323.62 Ha-m 3. Evapo transpiration (41%) = 809.04*41/100 = 331.71 Ha-m 4. Soil moisture (10%) = 809.04*10/100 = 80.90 Ha-m

  10. Survey Methodology 1 Initial Gramasabha 2 9 Documentation Data Collection Final GramaSabha & GPIP approval 3 Team Formation 8 4 Group Discussion PRA Exercises 7 Transact Walk Identification of works 5 6

  11. GPIP PLANNING -PUBLICITY

  12. Initial Grama Sabha

  13. Existing Water Resources in Kammur GP

  14. Water Budget Water availability Water deficit 1 Water receipt KAMMURU GP 2 3

  15. WATER Budget Rainfall receipt : Village area (Ha) = 1570.95 Average rainfall = 515 mm Annual rainfall = 1570.95 * 515 /1000 809.04 Ha-m Rainfall usage : 1. Ground water (9%) = 809.04*9/100 = 72.81 Ha-m 2. Run off (40%) = 809.04*40/100 = 323.62 Ha-m 3. Evapo transpiration (41%) = 809.04*41/100 = 331.71 Ha-m 4. Soil moisture (10%) = 809.04*10/100 = 80.90 Ha-m

  16. Survey Methodology 1 Initial Gramasabha 2 9 Documentation Data Collection Final GramaSabha & GPIP approval 3 Team Formation 8 4 Group Discussion PRA Exercises 7 Transact Walk Identification of works 5 6

  17. GPIP PLANNING -PUBLICITY

  18. Initial Grama Sabha

  19. Data collection

  20. Team Formation

  21. PRA EXCERCISE

  22. TRANSACT WALK

  23. Identification of works

  24. Group Discussion

  25. Identification of works

  26. Documentation

  27. Categories of works ( Identified ) Ridge area treatment Staggered Contour Trenches Continuous Contour Trenches Barren Hill Afforestration Water Absorption Trenches Drainage Line Treatment MPT/PT, Check Dams/Check Walls identified ValleyArea Treatment Farm Ponds/Dugout Ponds Silt Application/Desilting of water bodies Repairs and restoration to existing WHS Repairs and restoration to M I tanks. Recharge pits Recharging dried up open wells/Bore wells Horticulture plantations Institution plantations

  28. Action Plan to achieve water sufficiency

  29. GPIP for Year 2017-22 (65% NRM – EGS)

  30. GPIP for 2017-22 (with Balance Funds under IWMP)

  31. GPIP for 2017-22 ( Proposed under PMKSY)

  32. GPIP for 2017-22 (Proposed under NEERU- PRAGATHI )

  33. GPIP for 2017-22 (UNDER CONVERGENCE WITH MGNREGS)

  34. GPIP for 2017-22

  35. LABOR BUDGET NOTE: 10% INCREASE OF LABOUR BUDGET OVER EVERY YEAR

  36. Format - I (Community works)

  37. Format - I (Community works)

  38. Format - II (Individual Beneficiary related works)

  39. THANK YOU

More Related