1 / 20

SC 214/WG 78 Tracing and Validation

SC 214/WG 78 Tracing and Validation. John Gonda/Fred Picard. Closing the Loop – Global Standards RTCA – EUROCAE Joint Development. Environment Review & Revision. Technology Independent & Portable Service Definition. Operational Service Definition. Operational Safety Analysis.

mora
Download Presentation

SC 214/WG 78 Tracing and Validation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SC 214/WG 78Tracing and Validation John Gonda/Fred Picard

  2. Closing the Loop – Global StandardsRTCA – EUROCAE Joint Development Environment Review & Revision Technology Independent & Portable Service Definition Operational Service Definition Operational Safety Analysis Operational Performance Analysis Validation and Tracing Global Safety & Performance Requirement Definition Interoperability Requirement Definition- ATN - FANS Accommodation Operational Services and Environment Definition (OSED)

  3. SC 214 Tracing Resources • Operational Requirements • John Gonda • Ron Tornese • Brent Blackwell • Ed Brestle • SRs and PRs • Kathy Devito, Wim Brondsema • IRs • Fred Picard, Thierry Lelievre, Pascal Rohaut • DOORS • Tonyia Bellina

  4. SC 214/WG 78 Requirement Tracing Guidelines Required by both the SC 214/WG 78 CSG and VSG • ORs to ORs • Operating Method (OM) Tables to OM Tables • Section to Section • ORs to sections where ORs do not exist • Safety Requirements (SRs) to SRs • Performance Requirements (PRs) to PRs • Interoperability Requirements (IRs) to IRs

  5. Objective • Do one set of traces to suit the needs of the following: • SC214/WG78 • FAA DCP • FAA AVS • Others • Does not include Data Comm Program specification traces such as SSD to SC 214 etc • Use Excel to do the basic work • Intent is to port over to DOORs at the appropriate time

  6. SC 214/WG78 Tracing Requirements VSG-VA2 VSG-VA1 VSG-VA5 VSG-VA3 VSG-VA4 VSG-VA12 VSG-VA6

  7. Internal Validation Activities

  8. Internal Validation Activities (cont)

  9. Internal Validation Activities (cont)

  10. Missing Tracing Tasks? • 214/78 ATS Interop 214/78 FANS Interop • 9705 9880 • DO-219 DO-258 • CPDLC Message sets CPDLC Message sets • DO 258a ADS-C DO SC 214 ADS-C

  11. Backups

  12. SC 214/WG 78 Direction of Trace

  13. DCP Requirements Tracing Flow MITRE OI SE DO-306/ED-122 DO-258A/ED-100A DO-305/ED-154 Vendor One way trace SPR FANS-1/A– ATN Interop ATN Interop LM/OKC/DCNS Build FPR ESSD/WSSD/DCNSD ??????? New ATOP Build SSSs/SRSs/IRDs 214 Aircraft

  14. RTCA SC 214/EUROCAE WG 78 SPR Status • Draft Version H (incl ATN/FANS Interops) posted on a public website http://www.faa.gov/about/office_org/headquarters_offices/ato/service_units/techops/atc_comms_services/sc214/ • OEMs are building the SW applications • Configuration control has been instituted • Validation of the SPR is underway • Oceanic/Domestic Integration target - Version I • Green/Grey cover documents planned by December 2011

  15. Closing the Loop with 4D Trajectory Data Communications

  16. Closing the Loop on Interoperability DO-280B/ED-110B ATN Baseline 1 Continental Services DO-258A/ED-100A FANS 1/A+ Continental and Oceanic Services DO/ED-YYY ATN Advanced Continental & Oceanic Services Air INTEROP Req. ED-110B ED-100A DO/ED-YYY ATN INTEROP Ground INTEROP Req. ED-154 DO-305 ED-110B ED-100A DO/ED-YYY FANS INTEROP DO/ED-YYY DO - 280 / ED - 110 FANS 1 / A + ATN Advanced ATN Baseline 1 Oceanic Services Continental & Continental Services Oceanic Services

  17. Closing the Loop on Equipage CNS Data Collection Carrier Model Serial # Tail # Date of Mfg. #1 CDTI? EFVS? FANS? GPS? HUD? Equipage TAP/ CDA? ASAS? RNAV? RNP? Capability Etc. Confidence Building Equipage Analysis By tail number Detailed User Feedback Service For Equipage

  18. Closing the Loop - Capability vs Equipage Existing Planned

  19. Closing the Loop – FMS Software Migration to NextGen Communications

  20. Closing the Loop for NAS Users • Data Communications Software Applications • Context Management (CM - Log On) • Controller Pilot Data Link Communications (CPDLC) • Automatic Dependent Surveillance – Contract (ADS-C) • Flight Information Services (D-FIS) • New Operating Methods • Integration between navigation and communication functions for route auto load, position reporting and intent downlink • Improved use of Human Machine Interface for Requests • Trajectory based, closed loop operations • No major hardware replacement • If aircraft has capable CMU, radio and FMS • Maximize existing avionics through software upgrades

More Related