290 likes | 386 Views
LNG & Gas-fired generation on Texada Island?. Tsunami. Recent atmospheric carbon levels. National Oceanic and Atmospheric Administration. Atmospheric carbon Global temperature & Ice ages. http://www.daviesand.com/Choices/Precautionary_Planning/New_Data/.
E N D
LNG & Gas-fired generation on Texada Island?
Recent atmospheric carbon levels National Oceanic and Atmospheric Administration
Atmospheric carbonGlobal temperature& Ice ages http://www.daviesand.com/Choices/Precautionary_Planning/New_Data/
Greenhouse Gases in BC Throne Speech Reduce B.C.’s greenhouse gases by at least 33 per cent below current levels by 2020. Premier Gordon Campbell: “Climate change is real, and British Columbians are telling us we must do more as a government and as individuals.” “We will act to stem the growth of global warming and minimize the impacts already unleashed.”
Electricity and GHGs in BC BC Hydro Global Reporting Initiative Comparative Index
Electricity & Greenhouse Gases in BC Energy Plan 1. 50% of BC Hydro’s incremental resource needs through conservation by 2020. 10. Electricity self-sufficiency, including “insurance” by 2016. 18. All new generation projects will have zero net GHG emissions.* 19. Zero net GHG emissions from existing thermal generation by 2016.* 20. Zero GHG emissions from coal thermal electricity facilities. 21. Clean or renewable generation to account for 90% of BC generation.
Comox – Strathcona Regional District * Extend provincial policy requiring 100 per cent carbon sequestration to all fossil fuel-fired projects in BC, including any liquid natural gas (LNG) electricity generating facilities. August 2007 Burrard Thermal in Energy Plan 22. Government supports BC Hydro’s proposal to replace the firm energy supply from the Burrard Thermal plant with other resources. BC Hydro may choose to retain Burrard for capacity purposes after 2014.
Terasen (Fortis) Pipeline Terasen Gas Inc. (TGI) Terasen Gas Vancouver Island (TGVI)
Terasen Annual Sales Profile Approx 65% of annual volume is delivered Nov – Mar
Terasen’s Mt. Hayes LNG Storage • 1.5 billion cubic feet, up from 1.0 bcf • $200 million • Start construction 2008 • In operation 2011/2012 • Some factors in consideration: Burrard Thermal, Jackson Prairie, Whistler, ICP curtailment, pipe & compression additions
WestPac LNG Texada Project • LNG Receiving Terminal • Offloading, storage, conditioning, regasification & compression (“send-out”) • 3.6 bcf storage in two tanks • 500 mcf regasification & send-out capacity • BC Utilities Commission likely has some jurisdiction on business relationship with Terasen
WestPac LNG Texada Project • Gas-fired Generation Plant • Combined-cycle gas turbine (CCGT) • Scalable/expandable over time • Eg start with 300 or 600 megawatts (MW) • Expand to 1200 MW later • Approx gas use at 1200 MW could be 225 mcf/day • Depends on BC Hydro – electricity purchase agreement (EPA) • BC Utilities Commission decides on EPA
Regulatory Considerations • Environmental Assessment Office • Reviews everything technical, environmental • No significant interest in business deals or public opinion • Never turned down a project • Standard review is six months • Harmonized with federal review process (CEAA, EC, DFO …) • Possible application in January 2008? • BC Utilities Commission • Reviews economics and “public interest” • Legalistic, formal, intimidating • Participant funding is available
Considerations • Tankers (1 every 10 days, size, frequency, hazards and risks, federal policy, moratorium) • If Sumas 2 and Duke Point were bad, why is this good? • Context and rationale with Island Co-gen (ICP), Burrard Thermal, Site C • Energy Policy, Climate Change Goals
Allies • Lots of support, little money or time • “Keep it public” – COPE, BC Fed • “Keep it green” – environmental groups • “Keep it cool” – broad spectrum of climate change interests • “Keep it cheap” – industrial users, JIESC, Catalyst • Terasen – rates, turf
Local Government • Zoning jurisdiction? • Taxing authority (perhaps $2 million /year) • Annexation • Bill 30 • Official Community Plan (OCP) • Electoral Area support? • Municipal support?
Campaign Capacity • In for the long haul • Pace yourselves • Avoid burnout • A handful of people • Build capacity • Public meetings • Maintain visibility • Be the news
Campaign Ideas • Start your own newspaper • Keep your sense of humour • Don’t be rude or stupid • Notwithstanding, there is a place for just about anything in a campaign • Give people something to do