1 / 1

Team SYNERGY in Partnership with Parker PGI

Team SYNERGY in Partnership with Parker PGI. MINIMUM BLEED VALVE PROJECT. OBJECTIVE. Team Members: Charles Amadi (TL), Darius Mwalili, Joseph Page, and Ashley Burton Industry Advisor: Bruce Kasten of Parker PGI, and Brian Haygood of S.E.A.L.

more
Download Presentation

Team SYNERGY in Partnership with Parker PGI

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TeamSYNERGYin Partnership with Parker PGI MINIMUM BLEED VALVE PROJECT OBJECTIVE Team Members: Charles Amadi (TL), Darius Mwalili, Joseph Page, and Ashley Burton Industry Advisor: Bruce Kasten of Parker PGI, and Brian Haygood of S.E.A.L • Ensure design follows UL 125 specifications and is compatible with current service repair kits. • Construct a rapid prototype To determine the root cause and develop a solution to various issues experienced with Parker PGI’s minimum bleed valve assembly. GOALS • Redesign and fabricate handle assembly and swivel connection • Develop a load and pressure testing apparatus WBS RISK MiTIGRATION CAD MODELING

More Related