Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005

Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005. Giulio.G.Rosanova@nasa.gov 301-286-5907 . Lunar Reconnaissance Orbiter (LRO) Mechanical System Applicable Documents. 431-RQMT-000004 LRO Requirements Document

morela
Download Presentation

Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lunar Reconnaissance Orbiter (LRO)SRR/Mechanical SystemAugust 16-18, 2005 Giulio.G.Rosanova@nasa.gov 301-286-5907

  2. Lunar Reconnaissance Orbiter (LRO)Mechanical System Applicable Documents 431-RQMT-000004 LRO Requirements Document 430-PG-1410.2.1 Robotic Lunar Exploration Program Configuration Management Procedure 430-RQMT-000006 Robotic Lunar Exploration Program Mission Assurance Requirements Document 431-ANYS-000010 Radiation Analysis for the Lunar Reconnaissance Orbiter 431-PLAN-000005 LRO Systems Engineering Management Plan 431-PLAN-000110 LRO Contamination Control Plan 431-SPEC-000008 Electrical Systems Specification 431-SPEC-000012 LRO Mechanical Systems Specification 431-SPEC-000091 LRO Thermal Systems Specification 431-SPEC-000112 LRO Technical Resource Allocation Specification 431-SPEC-000113 LRO Pointing and Alignment Specification (ALL) LRO Instrument Mechanical Interface Control Documents (ALL) LRO Spacecraft Component Mechanical Interface Control Documents

  3. Lunar Reconnaissance Orbiter (LRO)Mechanical SystemLevel 2 Flow Down Key Requirements

  4. Lunar Reconnaissance Orbiter (LRO)Mechanical SystemLevel 2 Flow Down Key Requirements

  5. Lunar Reconnaissance Orbiter (LRO)Mechanical Concept ADDITIONAL VIEWS TO FOLLOW

  6. Lunar Reconnaissance Orbiter (LRO)Mechanical Verification Summary • Verify all Mechanical / Structural Designs and Functionality • Analysis • Comply with LRO General Structural-Thermal Environments, Interface, and Veification Requirements • Overall System Level Verification Matrix • Verification by Analysis, and or Verification by Test of Proto-Type and/or Proto-Flight Units • Facilitate Functional and Performance testing of the LRO Observatory • S/A & HGA Deployment Monitoring (Potentiometers) • S/A & HGA shall Survive in Deployed Position Immediately after Observatory Separation thru LTO • Qualification Testing • Mech System • Orbiter • Functional Testing • Life Tests • Deployment testing in T/V

  7. Lunar Reconnaissance Orbiter (LRO)Mechanical Requirements Summary • Mechanical System is ready to proceed to PDR