HWY 530 Landslide: Hydraulic Modeling in Support of County, State, and Federal Long-Term Planning. Travis Ball, PE USACE Seattle Hydraulic Engineering Section 2 May 2014. FEMA’s Hydraulic Modeling Effort: Mission Assigned to USACE.
E N D
HWY 530 Landslide: Hydraulic Modeling in Support of County, State, and Federal Long-Term Planning Travis Ball, PE USACE Seattle Hydraulic Engineering Section 2 May 2014
FEMA’s Hydraulic Modeling Effort: Mission Assigned to USACE • Planning-level modeling to help inform decision makers about long-term flood risks and channel alignment/geometry alternatives • Continue and add to the long-term modeling effort that will be ongoing by various parties for several months
North Combo Middle
Pre-Slide Conditions: 100-yr Event Slide Reach C-Post Road
Present Conditions: 100-yr Event Slide Reach 300.2 279.6 C-Post Road Current channel alignment and geometry
Future: North Alignment - 100yr Event Slide Reach C-Post Road
Future: Middle Alignment- 100yr Event Slide Reach C-Post Road
Future: Combo Alignment- 100yr Event Slide Reach C-Post Road
Future: 2yr Event – 150’ Wide Slide Reach C-Post Road
Future: 2yr Event – 75’ Wide Slide Reach C-Post Road
Future: 10yr Event – 150’ Wide Slide Reach C-Post Road
Future: 10yr Event – 75’ Wide Slide Reach C-Post Road