1 / 2

Concern over impact of over ambitious access scenarios on design compromises

To note for actions from Wednesday. Concern over impact of over ambitious access scenarios on design compromises Feasibility of remote pixel installation needs to be proven at a very early stage. Take concern to ITK – formulate – homework - friday

moriah
Download Presentation

Concern over impact of over ambitious access scenarios on design compromises

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. To note for actions from Wednesday • Concern over impact of over ambitious access scenarios on design compromises • Feasibility of remote pixel installation needs to be proven at a very early stage. • Take concern to ITK – formulate – homework - friday • Location of opto-electrical conversion for strip detector. Path to decision – Friday • Side mounted Eos for barrel strip – now baseline • future full length prototypes built this way • 2e mounting scheme to adapt - ? • Path to EoS cooling pipe layout decision – Friday • Discrete vs continuous interconnects – path to decision – Friday • Grounding - Isolation immediately at end of local support – baseline • Path to confirmation of baseline – Friday • Pipes/core to be connected to power cable shield • Cooling pipe loop shape/location • Sharp bend, 8mm, pushed to z=0 end – baseline • Allowing for radiation profile = headroom along stave • To foam or not to foam that is the bend question – path to decision Friday • Path to confirmation of baseline, including z=120 simulation – Friday • Co-cured pipe to foam for strips – relevant to strips? Friday Friday afternoon is a ‘planning’ session. Proposal was to compile list of items to discuss/ plan way forward

  2. Thermal headroom utilisation in barrel stave • Module gluing simplification, • skin thinning, … path to choice to be defined – Friday • Barrel stave contraction – fixation z=0 or z=1.2 – path Friday • End of stave fixing arrangement design needed • path to definition/design – Friday • Define stave to macro-structure stability requirements – path Friday • Defer to after further talks • SE445 vs IRS2125 • Attaching pipes to foam in strip detector (co-cure?) • Use of IR, vibration, 4point bend in QA • Also for note • In mechanical FEA, joints/fixation need extreme attention to properly simulate – use large safety factor for joints X10 rather than simulate • Concepts exist for macro supports – insufficient effort to take forward • Lower density thermal foams are under development - ~18 months to availability • Cooling pipes successfully co-cured in pixel stave, wrapped and unwrapped

More Related