Clark County PM 10 Saturation Study. Robert A. Baxter, CCM T & B Systems, Inc. Background. Clark County is in non-attainment for the 24-hour PM 10 NAAQS 2001 SIP made a commitment to conduct a PM 10 saturation study Study to begin in 2004 and be completed in 2006.

morrie
Download Presentation

Clark County PM 10 Saturation Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Clark County PM10Saturation Study Robert A. Baxter, CCM T & B Systems, Inc.

  2. Background • Clark County is in non-attainment for the 24-hour PM10 NAAQS • 2001 SIP made a commitment to conduct a PM10 saturation study • Study to begin in 2004 and be completed in 2006

  3. Study Goals and Objectives • Determine neighborhood impacts of major sources • Determine PM concentrations in locations that may not be covered by the current monitoring network • Determine inter-basin and intra-basin transport during high wind events

  4. Study Design • Evaluate existing data sets for apparent trends • Design the monitoring network • Sampler evaluation (fall 2004) • Acquire appropriate saturation sites • Saturation study (April 15 – June 30) • Evaluate the collected data

  5. PM10 Data EvaluationYears 2000 – 2003

  6. PM10 Data EvaluationYears 2000 – 2003

  7. PM10 Data EvaluationYears 2000 – 2003

  8. DAQEM PM10 Site Locations

  9. PM10 Site Locations

  10. DAQEM PM10 Site Locations

  11. PM10 Site Locations

  12. PM10 Instrument Evaluation • Two evaluation sites • Crustal PM10 • Combustion emissions related PM10 • Evaluation Criteria • Continuous Method • Acceptable performance • No environmental controls • Solar power • Inconspicuous • Cost-effective • Reliable

  13. PM10 Instrument EvaluationOctober/November 2004

  14. PM10 Instrument EvaluationOctober/November 2004

  15. Selected Instrumentation • TSI DustTrak • External data logging • Extended sample inlet • Solar/available power

  16. Instrument Siting

  17. Instrument Siting

  18. Saturation Sampling Schedule • Study Period = April 15 – June 30 • Continuous sampling for study duration • QA program for network assessment and performance • Weekly data downloads and QC checks

  19. What Have We Seen? • Fall and winter rainy periods • Late spring/early summer high wind events • Wind events produced short lived PM10 “episodes” • No PM10 exceedances in the Las Vegas Valley network • Desert environment is rough on instrumentation

  20. Questions? Please contact: Department of Air Quality and Environmental Management (DAQEM) (702) 455-5942