PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA) EU-Africa Partnership for Infrastructure Tunis, 7 April 2010

African Development Bank Group. African Union. NEPAD. PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA) EU-Africa Partnership for Infrastructure Tunis, 7 April 2010. OUTLINE. A. CONTEXT AFRICAN INFRASTRUCTURE B. PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA)

mort
Download Presentation

PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA) EU-Africa Partnership for Infrastructure Tunis, 7 April 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. African Development Bank Group African Union NEPAD PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA)EU-Africa Partnership for InfrastructureTunis, 7 April 2010

  2. OUTLINE A. CONTEXT • AFRICAN INFRASTRUCTURE B. PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA) • PIDA SCOPE • OBJECTIVES OF PIDA & RESULTS EXPETED FROM THE STUDY • KEY FEATURES OF PIDA • PIDA STUDY MAIN COMPONENTS • STUDY STRUCTURE • STUDY GOVERNANCE • BUDGET AND PLANNING OF PIDA STUDY C. CONCLUSION

  3. A. BACKGROUND I- AFRICAN INFRASTRUCTURE 1.1. Infrastructure pillar of economic grow and regional integration. Infrastructure have significant implications for achievement of sustainable development objectives in Africa: •  Therefore critical role of infrastructure in Africa widely recognized • But deficit in Africa infrastructure also widely recognized 1.2. Initiatives on Infrastructure development Against this deficit, many initiatives has been undertaken or are ongoing, including: • EU-Africa Infrastructure Partnership; • African initiatives: NEPAD Short Term Action Plan (STAP), NEPAD Medium to Long Term Strategic Framework (MLTSF), Programme for Infrastructure development in Africa (PIDA); • Infrastructure Consortium for Africa (ICA); • Others: African Infrastructure Country Diagnostic Study (AICD), African Action Plan (AAP), bilateral partnership, etc

  4. B. PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA) I. PIDA SCOPE PIDA Project covers the 4 sectors ,Energy, Transport, Information & Communication Technology (ICT) and Water (Transboundary), and will be to be implemented in two major step: study step and the step of implementing the results of the study: PIDA overall objective is to optimise the efforts and use of resources in order to enable African Stakeholders to speak with one voice based on a common agenda and a common vision for infrastructure development. PIDA will benefit from Lesson’s learned and data of studies and initiatives already undertaken or ongoing: II. OBJECTIVES OF PIDA AND EXPECTED RESULTS OF THE STUDY

  5. B. PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA) II. OBJECTIVES OF PIDA AND EXPECTED RESULTS OF THE STUDY (CONT.) The specific objectives of PIDA are to enable African decision-makers to: • Establish and implement a strategic framework for the development of regional and continental infrastructure based on a development vision, strategic objectives and sector policies; • Establish and implement an infrastructure development programme articulated around priorities and phases; and • Prepare an implementation strategy and process including, in particular, a priority action plan.

  6. B. PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA) III. KEY FEATURES OF PIDA Key features of PIDA are: • Strong consensus , • Making sense of existing knowledge , • African owned , • Policy and program oriented (Transport, Energy, Water, Telecoms & ICT sectors), • Quality assurance, • Specified implementation strategy

  7. B. PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA) IV-PIDA STUDY MAIN COMPONENTS Components: Sector Studies Supporting Components Telecom/ ICT Panel of experts Water Database Energy Transport

  8. B. PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA) PIDA studies are structured according to the following a common phases: V. STUDY STRUCTURE PIDA GOVERNANCE Phase I : Diagnostic, analytical work and projections Phase II : Formulation of Sector Policies & Infrastructure Development Plan Phase III: Synthesis & Recommendations

  9. B. PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA) V. STUDY STRUCTURE ( Cont.) OUTPUTS & INPUTS OF PHASES ACTIVITY OBJECTIVES • INCEPTION • Outline of Consortium organization & Program of work , Methodology, approach and initial findings; • Contact with stakeholders to identify the nature &scope of existing information sources and start analysis and strategic thinking from data & information already available from: STAP, RECs policies, AICD, etc. • Summary of prospects • Report on: The evaluation of regional & Continental policies & strategies, outlook for the future and challenges in Infrastructure development, outline of Infrastructure development programme Assessment of Policies & Programmes PHASE: I Diagnostic & Analysis Development of Future outlook Quality Control and Approval: review and approval process by PIDA governance • INCEPTION REPORT • Detailed description of tasks to be undertaken, schedule of activities, resources • Detailed collected data /to be collected , necessary for the analytical work • Analytical framework to be used in the analysis for current /formulation policies, strategies • Proposed methodology for the analysis of on-going and pipeline programmes • First outline of the methodology to be used for projections, etc. • Etc. TO PHASE II

  10. Sectors reports Workshop Reports B. PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA) V. STUDY STRUCTURE (Cont.) OUTPUTS & INPUTS OF PHASES ACTIVITY OBJECTIVES • DraftPolicy • Draft Program • Draft • implementation • strategy Phase II: : Formulation of Sector Policy and Plan of Priority Actions Quality Control and Approval: review and approval process by PIDA governance Policy Proposals Programme Proposals Phase III:Synthesis and Recommendations Policy Proposals Synthesis report Programme Proposals Implementation strategy Quality Control and Approval: review and approval process by PIDA governance and final approval of the study results by AU Structures

  11. B. PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA) Governance Structure VI. STUDY GOVERNANCE Main roles Approval and Guidance AUC chairs Project Team presents Members: ADB + NEPAD Sec.+ RECs + ECA, Observers: ICA, IPPF, SI Quality control AUC+ADB co-chair Members: NEPAD Sec. + ECA + resource persons from SI Procurement and financial management ADB Project management ADB project manager, Sector Experts, Research Assistant, Admin. Support

  12. B. PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA) VI. STUDY GOVERNANCE(Cont.) Focal Points and TechnicalMembers • Focal Points • At RECs level • At main Specialized Institutions (SI) level • Other regional institutions • Technical members (Other than AUC, AfDB & NEPAD Sec) • Infrastructure/sector experts from RECs • Experts from Specialized Institutions NB: Member States experts are committed at regional level • Development Partners • Infrastructure partners fully involved as main Observers

  13. B. PROGRAMME FOR INFRASTRUCTURE DEVELOPMENT IN AFRICA (PIDA) • VII. BUDGET AND PLANNING OF PIDA STUDY • Overall Esteemed budget: 7.781 Million Euros(M€) . The Funding sources are: • Trough the African Union Commission: • NEPAD IPPF ; • European Union; • Islamic Development Bank (IsDB); • African Water Facility (AWF); • Trough the African Development Bank: • African Development Fund (ADF) Grant MLTSF; • Nigeria Technical Cooperation Fund (NTCF); • Department of International Development (DfID) UK; • Planning to complete the study: 18 months

  14. C. CONCLUSION • PIDA is a strategic tool and reference framework for the • Development of infrastructure in Africa; • A strong support / commitment (political, financial, technical) • is needed to achieve PIDA objectives ; • PIDA is a dynamical process from study step to the step of • implementing the results of the study. 14

  15. شكرا لكم MERCI OBRIGADO THANK YOU