550 likes | 1.15k Views
Contents. The functions of an electrical switchboard. The IEC 60439-1standard. Prisma Plus : a structured switchboard based on functional units. Forms: partitioningForms : separations within an assembly. The minimum requirements to guarantee the safety of a LV switchboard. The tests of standard IEC 60439-1.
E N D
1. Prisma Plus the tested switchboard,complying with standard IEC 60 439-1
2. Contents
3. The low voltage switchboard A vital link for electrical distribution
4. The low voltage electrical switchboard Definitions
5. The functions of an electrical switchboard To group and protect against external influences the protection and control devices and all their electrical and mechanical connections.
6. The functions of an electrical switchboard Definitions
Some of the components or specificities of the switchboard realize and/or guarantee its finalities,
in functional term :
7. The IEC 60439-1 standard The IEC 60439-1 standard gives general rules for switchboards construction to meet with safety and availability needs required by the application
guarantees the minimum level of safety of people and equipment
concerns the low-voltage switchgear and controlgear assemblies for the power distribution and control.
states :
- the service conditions (temperature...)
- the construction requirements (IP, IK, forms,...)
- the tests requirements
8. Prisma Plus :a structured switchboard based on functional units This modular design brings much clearness to the switchboard :
incoming unit
current distribution units
feeder units
distribution units
connection units
communication units
9. IEC 60439-1 Standard and Prisma Plus :a structured switchboard based on functional units Incoming units : incoming circuit breaker (Masterpact, Compact NS, Interpact INS...).
10. Forms: partitioning In most installations, Prisma Plus cubicles do not require partitioning, Schneider Electric offering options and features that go well beyond the recommendations of the standard :
front plates requiring a tool to be removed
doors providing access to live parts are keylocked
systematic installation of terminal shields on Compact NS circuit breakers and Interpact INS and INV switch-disconnectors
upstream and downstream terminals on the incoming device are covered
The protection of people and equipment is ensured on origin
However, Prisma Plus offers different levels of partitioning to create separations inside the cubicles and thus create Form 2,3 and 4, as defined by the standard.
11. Forms : separations within an assembly
12. Forms : separations within an assembly Form 1 : no separation within the enclosure.
13. The minimum requirements to guarantee the reliability of a LV switchboard First of all, it must comply with standards :
14. The tests of standard IEC 60439-1 7 type tests :
n°1 - temperature rise limits
n°2 - dielectric properties
n°3 - short-circuit withstand
n°4 - protective circuit effectiveness
n°5 - clearances and creepage distances
n°6 - mechanical operation
n°7 - degree of protection
15. 7 type tests performed by the manufacturer The aim of these tests is to confirm the switchboard characteristics.
16. Test n°1(8-2-1) :Temperature rise limits Guarantees the safety and reliability of the switchboard, by avoiding problems such as :
connection damages
reduction in insulation performances
risk of burn for maintenance operators
electronic components damages
faulty operation of the devices : inopportune release
17. Test n°1(8-2-1) :Temperature rise limits Conditions
18. Test n°1(8-2-1) :Temperature rise limits Results
19. Test n°2 (8-2-2) : dielectric properties Guarantees the switchboard safety and reliability , to avoid problems such as :
electrical arc generation
insulation performance decreasing
connection damages
20. Test n°2 (8-2-2) : dielectric properties
21. Test n°2 (8-2-2) : dielectric properties Results
22. Test n°3 (8-2-3) : short-circuit withstand This test simulates an incident which could occur on site
23. Test n°3 (8-2-3) : short-circuit withstand
24. Test n°3 (8-2-3) : short-circuit withstand Results
25. Test n°4 (8-2-4) : effectiveness of the protective circuit The effectiveness of the protective circuit is verified by two tests :
resistance measurement of the connection between the exposed conductive parts and the protective circuits
short-circuit withstand performed between the protective conductor and the nearest phase conductor.
26. Test n°4 (8-2-4) : effectiveness of the protective circuit
27. Test n°4 (8-2-4) : effectiveness of the protective circuit Results
28. Clearance control : shortest distance between two conductive parts.
Creepage distance control : shortest distance along the surface of an insulating material between two conductive parts.
29. Test n°5 (8-2-5) : clearance and creepage distances
30. Test n°5 (8-2-5) : clearance and creepage distances Results
31. Test n°6 (8-2-6) : mechanical operation Endurance of material, guaranteeing the longevity of the various mechanisms.
32. Test n°6 (8-2-6) : mechanical operation
33. Results Test n°6 (8-2-6) : mechanical operation
34. Test n°7 (8-2-7) : degree of protection
35. Test n°7 (8-2-7) : degree of protection
36. Test n°7 (8-2-7) : degree of protection Results
37. The IP degrees of protection : (IEC 60529/EN 60529) 1st digit:
protection of persons
protection against solids.
38. Degree of protection The IEC 60529 standard (02/ 2001) gives , by the IP code, the different degrees of protection provided by an electrical enclosure.
39. IK code : 2 digits giving the level of shock energy, in Joules :
IK 01 : 0,14
IK 02 : 0,2
IK 03 : 0,35
IK 04 : 0,5
IK 05 : 0,7
IK 06 : 1
IK 07 : 2
IK 08 : 5
IK 09 : 10
IK 10 : 20. Degree of protection :IK (IEC 62262)
40. 3 routine tests performed by the panelbuilder The 3 routine tests, easily and rapidly performed, must be carried out by the panelbuilder. :
overall inspection according to the mounting instructions and technical documents (right device ratings, tightening torques)
insulation checking by a dielectric test
checking of protective measures and of the electrical continuity of the protective circuits.
41. Test n°8 (8-3-1) : cabling, electrical operation
42. Test n°8 (8-3-1) : cabling, electrical operation
43. Test n°8 (8-3-1) : cabling, electrical operation Results
44. Test n°9 (8-3-4) : insulation resistance / (8-3-2) : dielectric test
45. Test n°9 (8-3-4) : insulation resistance / (8-3-2) : dielectric test
46. Test n°9 (8-3-4) : insulation resistance / (8-3-2) : dielectric test Results
47. Test n°10 (8-3-3) : protective measures
48. Test n°10 (8-3-3) : protective measures
49. Test n°10 (8-3-3) : protective measures Results
50. Panelbuilder and manufacturer, together to offer maximum safety and realibility Manufacturer :
products tested in real configurations
detailed instructions for fautless construction.
51. Panelbuilder and manufacturer, together to offer maximum safety and realibility Panelbuilders (and installators workshops) :
they complete a work of quality, simply
they minimize the risk related to their responsibility for realization of a switchboard of which they know and ensure the level of safety
they carry out very simply the conformity to the standard, therefore CE marking
they develop their professionalism by making known it
they are different from the other panelbuilders
they profit from the transfer of Schneider Electric s experiment and tools
52. Prisma Plus and IEC 60439-1 standard : an international influence IEC 60439-1 : the same standard for all the professionals of switchboards