1 / 1

Platform

LPD-17. LPD-17. Amphibious Transport Dock LPD-17 San Antonio Class. Platform. Description. Speed 24.5 kts Draft 23.0 ft (Full Load) Crew 364 (29 Officers; 33 >E7; 302 <E6) Embarked Landing Force 697 (66 Officers; 42 >E7; 589 <E6); 101 Surge

morwen
Download Presentation

Platform

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LPD-17 LPD-17 Amphibious Transport DockLPD-17 San Antonio Class Platform Description Speed 24.5 kts Draft 23.0 ft (Full Load) Crew 364 (29 Officers; 33 >E7; 302 <E6) Embarked Landing Force 697 (66 Officers; 42 >E7; 589 <E6); 101 Surge Medical Capability 2 OR; 6 ICU; 16 Ward; 2 Isolation Ward; 3 Battle Mass Casualty/Receiving 100 Overflow berths (Level II CRTS) Potable Water Distill 72,000 gal/day Surface Interface Point 1 Well Deck Capacity 2 LCAC or 1 LCU; 14 EFV Flight Deck 2 Ops Spots/4 Exp Spots; 15,200 ft2 Hangar Bay 1,500 ft2 (1 MV-22 or CH-53K) Vehicle Square 23,163 ft2 (U/V 6,538 ft2, L/V 7,375 ft2, M/V 9,348 ft2) Cargo Cube 34,000 ft3 Lifting Capability Aviation Bridge Crane (4.3K lbs); Articulating Boom Crane (22K lbs); Well Bridge Crane (10K lbs) Cargo Fuel (JP5) 315,000 gal LPD-17 SLCP dated 10 Jan 07 Functionally replace LPD 4, LSD 36, LKA 113, LST 1179 and LCC Ship classes Program Status Issues • Original Program of Record was for 12 ships but was reduced to a 9 ship buy in ’06. • 9th ship (LPD-25) to be delivered in FY-12 • Marine Corps requires a 10th and 11th LPD 17 to meet 2.0 MEB of Lift, #2 on USN FY09 unfunded list and #1 on the CMC’s unfunded requirements • LPD-17 hull form may be used for LCC(R) and LSD(X) platforms based on Navy Single Hull initiative. • SWAN system has had technical problems impacting ships schedule and resulting in CNO level attention • Loss of Lo/Lo capabilities. • MOGAS storage and usage in review. • Standardized lay-out and assignment ship spaces • The San Antonio-class is designed to execute OMFTS/STOM & support Marine landing force in an assault by helicopter, landing craft and amphibious vehicles to conduct amphibious warfare. • LPD-17 USS San Antonio; Comm 14 Jan 06, Norfolk, (Deployment work ups). • LPD-18 USS New Orleans; Comm 5 Mar 07, San Diego. (FCT) • LPD-19 USS Mesa Verde; Comm 15 Dec 07, Norfolk. (Shock Trials) • LPD-20 USS Green Bay; Projected Comm Oct 08, San Diego (PSA) • LPD-21 USS New York; Delivery June 09, Norfolk. (New Construct) • LPD-22 USS San Diego; Delivery Aug 10 Oct 10, San Diego,(New Construct) • LPD-23 USS Anchorage; Delivery Feb 11 Jan 11, San Diego (Authorized) • LPD-24 USS Arlington; Delivery Aug 11 Norfolk, (Authorized). • LPD-25 USS Somerset; Delivery Dec 12, Norfolk, (Planned).9th LPD • LPD-26 None (Planned).10th LPD • LPD-27 None (Planned). 11th LPD • Compliments the MEU ACE; simultaneously land/launch (2) CH-53/MV-22; expanded flight deck operates (4) H-1’s or (2) H-1’s & (1) H-46, and recover an AV-8 under VFR during daylight. 1 3-6

More Related