Assuring Compliance with Waste Acceptance Requirements

Assuring Compliance with Waste Acceptance Requirements. Federal Office for Radiation Protection Department SE Safety of Nuclear Waste Management Section SE 3.1 Waste Package Quality Control Stefan Steyer Waste Acceptance Criteria for Disposal of Very Low, Low and Intermediate Level Waste

moses
Download Presentation

Assuring Compliance with Waste Acceptance Requirements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Assuring Compliance with Waste Acceptance Requirements • Federal Office for Radiation Protection • Department SE • Safety of Nuclear Waste Management • Section SE 3.1 • Waste Package Quality Control • Stefan Steyer • Waste Acceptance Criteria for Disposal of • Very Low, Low and Intermediate Level Waste • 30 September 2010, Peine, Germany

  2. Waste Acceptance Requirements and Quality Control SafetyAnalyses Waste Acceptance Requirements Model Data Quality Control

  3. Quality Control Measures for Radioactive Waste Packages • Process Qualification with Accompanying Inspections • Spot Checking of Legacy Waste • Type Checking of Containers

  4. Process Qualification Manual

  5. Spot Checking of Legacy Waste 0.5 to 12 %

  6. Process Qualification versus Spot Checking • Process Qualification: • Handbook orProcess Control Quality Plan • Statement on the Suitability of the Process • Accompanying Inspections • Mandatory according to §74 Radiation Protection Ordinance • Spot Checking: • Applicable to Legacy Waste • Checking of 0.5 to 12 % of the Waste Products

  7. Type Testing of Containers • Production of Containers including QA Measures • Prototype Test • Assessment of the Application Documents (Construction Drawings,Parts Lists), Results of the Prototype Test and the QA Measures • Supervision of the Container Production

  8. Prototype Test • Stacking Test (6 m) -> Stackability • Lifting Test -> Handling • Drop Test 0.8 m (4 m/s) • Drop Test 5 m • Thermal Test (1 h at 800 °C)

  9. Drop Test 5 m

  10. Thermal Test (1 h at 800 °C)

  11. Thank You for Your Attention