1 / 50

Chapter 7

Chapter 7. Process Control. Control Systems. Standard or goal Means of measuring accomplishment Comparison of results with the standard to form the basis for corrective action. Visual Inspection. Visual inspection processes incur high error rates because of Complexity of designs

moshef
Download Presentation

Chapter 7

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 7 Process Control

  2. Control Systems • Standard or goal • Means of measuring accomplishment • Comparison of results with the standard to form the basis for corrective action

  3. Visual Inspection • Visual inspection processes incur high error rates because of • Complexity of designs • Mistakes resulting from low incidence of errors • Time pressure

  4. Documentation and Audits • Dashboards and scorecards • Standard operating procedures (SOPs) • Quality manual • Internal audits

  5. Control in Services • Time • Number of nonconformances • Observable errors • Behavior

  6. Statistical Process Control (SPC) • Statistical process control – a methodology for monitoring a process to identify special causes of variation and signal the need to take corrective action when appropriate

  7. SPC Metrics • Attribute – a performance characteristic either present or absent in a product or service • Variable – a measurement of the degree of conformance to specifications

  8. Control Charts • Run chart – a line graph showing data plotted over time • Control chart – a run chart with statistically-determined upper and lower control limits (UCL and LCL)

  9. Structure of a Control Chart

  10. Control Chart Applications in Service Organizations

  11. Controlled Process • No points are outside control limits. • The number of points above and below the center line is about the same. • The points seem to fall randomly above and below the center line. • Most points, but not all, are near the center line, and only a few are close to the control limits.

  12. Typical Out-of-Control Patterns • Point outside control limits • Sudden shift in process average • Cycles • Trends • Hugging the center line • Hugging the control limits

  13. Shift in Process Average

  14. Identifying Shifts

  15. Cycles

  16. Trend

  17. Hugging Center Line

  18. Hugging Control Limits

  19. Histograms vs. Control Charts • Histograms do not take into account changes over time. • Control charts can tell us when a process changes

  20. Control Chart Methodology • Prepare • Choose measurement • Determine how to collect data, sample size, and frequency of sampling • Set up an initial control chart • Collect Data • Record data • Calculate appropriate statistics • Plot statistics on chart

  21. Next Steps • Determine trial control limits • Center line (process average) • Compute UCL, LCL • Analyze and interpret results • Determine if in control • Eliminate out-of-control points • Recompute control limits as necessary

  22. Final Steps • Use as a problem-solving tool • Continue to collect and plot data • Take corrective action when necessary

  23. Control Charts for Variables Data • x-bar and R-charts • Basic calculations

  24. Estimating Short-Term Process Capability • Estimate the standard deviation using control chart data: • This approach is not as accurate as computing the true standard deviation of the observations and is not recommended.

  25. Case Study: La Ventana Window Company • La Ventana received some complaints about narrow, misfitting gaps between the upper and lower window sashes • The plant manager wants to evaluate the capability of a critical cutting operation that he suspects might be the source of the gap problem. • The nominal specification for this cutting operation is 25.500 inches with a tolerance of 0.030 inch. • Inspect five consecutive window panels in the middle of each shift over a 15-day period and recording the dimension of the cut

  26. La Ventana Case Data

  27. Control Limit Calculations • n = 5; A2 = 0.577 and D4 = 2.114

  28. Spreadsheet Template

  29. Control Charts

  30. Interpretation • Sample 24 out of control in R-chart • Samples 9, 21, and 24 out of control in x-bar chart • Common characteristic: Shane was process operator • Attribute results to special cause variation and delete these samples • New control limits:

  31. Using the Control Chart Template • You may need to rescale the vertical axis of the charts to eliminate blank space and make them more visually appealing. See the appropriate Excel help files for the version you are using. This is rarely necessary. • When a sample is deleted from a data set in the templates, do not enter zero for the data; instead, leave the cells blank (just delete the data using the (“delete” key). The charts are set up to interpolate between non-missing data points. • When deleting sample data, be sure to update the number of samples used in the calculations to compute the statistics or the control charts will not display correctly.

  32. Revised Control Charts

  33. Process Capability Results

  34. New Production Data

  35. Using Templates with Additional Data • When adding additional data to the spreadsheet template but to maintain the established control limits, do not change the number of samples in cell E6 on which the control limits were based. • Also, you must modify the formulas in cells C9 and C10 for the calculations of the grand average and average range to use only the column range of the original data so as not to change the calculated center lines or control limits. • The template will still chart all the data, but use control limits established from the original samples.

  36. Example Spreadsheet Modifications • In cell C9, change the formula to read: =SUMIF(B13:AE13,“>-99999”,B23:AE23)/$E$6. • C10 should be changed to: =SUMIF(B13:AE13,“>-99999”,B28:AE28)/$E$6.

  37. Charts with Additional Data Increased variation Upward trend in average

  38. x-Bar and s-Charts • Standard deviation • s-chart control limits • x-bar chart control limits

  39. Charts for Attributes • A nonconformance (defect, error) is a single nonconforming quality characteristic of a unit of work. • If a unit of work has one or more nonconformances, we term the entire unit nonconforming. • Attribute charts are used formonitoring nonconformances as well as the number nonconforming

  40. Fraction Nonconforming (p) Chart • Collect k samples. Let yi represent the number of nonconforming units in sample i, and ni be the size of sample i. • Compute the fraction nonconforming in each sample, pi = yi/ni • Average fraction nonconforming • Compute standard deviation • Control limits

  41. Spreadsheet Template

  42. Variable Sample Size • The p-chart will have control limits that vary with the sample size

  43. Example Spreadsheet Template

  44. Example p-Chart With Variable Sample Size

  45. p-Chart With Average Sample Size • Use the average sample size (n-bar) to compute approximate control limits • Use the average sample size method when the sample sizes fall within 25 percent of the average.

  46. c-Chart for Nonconformances Per Unit • Collect samples of equal size and count the number of nonconformances • Compute the average number of nonconformances per unit, c-bar • Standard deviation • Control limits

  47. u-Chart for Nonconformances Per Unit • Collect samples and count the number of nonconformances • Compute the average number of nonconformances per unit, u-bar • Standard deviation • Control limits

  48. Control Chart Design Issues • Basis for sampling • Sample size • Frequency of sampling • Location of control limits

  49. Project Review – Control (1 of 2) • Process changes have been adequately documented • Documentation for new process has been completed • Process owners have been assigned responsibility for ongoing control • Process capability for new process has been determined • Systems, such as statistical process control, have been developed to identify out-of-control performance

  50. Project Review – Control (2 of 2) • Responsibility for control and adjustment has been given to appropriate process owners • Senior management has been informed of the project results • Team members have been thanked, rewarded, and given appropriate new assignments

More Related