1 / 3

NE Resources (1)

NE Resources (1). Netherlands (NLGrid) – two sites 366 WN CPUs 2 disk SEs: 7 TB, mass storage SE: 20TB tape 2 RBs, RLS and VO LDAP servers for NL-Grid and EGEE VO support National: NCF, PVIER, ASTRON, Nadc, VLe, Asci EGEE: ALICE, ATLAS, LHCb, CMS, Dzero, ESR, Magic

mostyn
Download Presentation

NE Resources (1)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NE Resources (1) • Netherlands (NLGrid) – two sites • 366 WN CPUs • 2 disk SEs: 7 TB, mass storage SE: 20TB tape • 2 RBs, RLS and VO LDAP servers for NL-Grid and EGEE • VO support • National: NCF, PVIER, ASTRON, Nadc, VLe, Asci • EGEE: ALICE, ATLAS, LHCb, CMS, Dzero, ESR, Magic • Cluster with 544 Xeon™ CPUs may become CE (with Debian OS) later this year • Belgium (BEGrid) • 6 sites running LCG2 software, not integrated in EGEE yet SA1 ARM meeting 17-18 March, Lyon

  2. NE Resources (2) • Sweden (SNIC/SWEGRID) Three sites • HPC2N • 100 CPU cluster • LCG2.3, SLC CE, Debian WN • SE 10 TB • Worker nodes are shared between EGEE and SweGrid (ARC) • PDC • Installation in preparation of a 100 CPU system • Eventually new 884 CPU Xeon EM64T cluster (in stable gLite time) • NSC • 32 CPU cluster on pre-production testbed • SLC all over • LCG23 • Other stuff ( GGAS (Grid bank), SWEGRID VO Management tool) • Finish RC earliest April • VO support • National: Atlas, NorduGrid (used for individual scientists using SweGrid) • To be transferred to EGEE SA1 ARM meeting 17-18 March, Lyon

  3. NE Issues • Many answers can be found (for LCG) in the LCG-ROLLOUT archives • can we consolidate? • Accounting: we need filters to extract VO specific information • CIC on Duty – communication sometimes difficult • No response to questions/remarks • Local support not yet centralized SA1 ARM meeting 17-18 March, Lyon

More Related