1 / 8

FCC Fixed Wireless Service Proceedings Overview

Learn about FCC actions and pending resolutions for Fixed Wireless Service. Explore 18 GHz rechanneling, 11 GHz antennas, FWCC-SkyBridge agreement, interference temperature, and other crucial FCC proceedings.

mtamayo
Download Presentation

FCC Fixed Wireless Service Proceedings Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. National Spectrum Managers Association Industry Round Table –Fixed Wireless ServiceMay 16, 2006Mitchell Lazarus | 703-812-0440 | lazarus@fhhlaw.com

  2. Fixed Service Proceedings at FCC • FCC actions in past year relating to the Fixed Service: • none • FCC proceedings overdue for resolution: • 18 GHz rechanneling • 2-foot antennas at 11 GHz • FWCC-SkyBridge agreement • interference temperature • (more).

  3. 18 GHz Rechanneling • 2000-2001: FCC split 18 GHz band between FS and FSS • inadvertently eliminated 5 and 6 MHz FS channels • left only 10, 20, 40, 80 MHz • May 2002: FWCC and NSMA jointly filed for waiver: • asked to coordinate 2.5, 5, 6, 30, and 50 MHz channels • no opposition • April 2004: FCC released NPRM • no opposition • Awaiting FCC action.

  4. 2-Foot Antennas at 11 GHz • May 2004: FiberTower filed petition for rulemaking • 2-foot antennas at 11 GHz (present rules require 4-foot) • provides service where not possible otherwise • also: lower cost, better esthetics, zoning compliance • proposed coordination rules fully protect 4-foot users, satellite earth stations • place any disadvantage on the 2-foot user • Sole opposition: satellite industry fears more FS use • October 2004: FiberTower filed request for waiver • Awaiting FCC action.

  5. FWCC and SkyBridge • November 1998: FCC proposed SkyBridge downlink gateway stations in 10.7-11.7 GHz FS band • December 1999: FWCC and SkyBridge filed joint proposal for sharing in the band • December 2003: FCC issued NPRM based on variation of the joint proposal • in comments, FWCC and SkyBridge jointly reasserted their original proposal • Awaiting FCC action.

  6. Interference Temperature • November 2003: FCC issued NOI/NPRM • NPRM proposed unlicensed devices in 6525-6700 MHz, 12.75-13.25 GHz FS bands • based on detect-and-avoid (DAA) technology • April-May 2004: strong opposition, negligible support • FWCC shows DAA cannot protect FS receivers • Awaiting FCC action.

  7. Other Pending FS Proceedings • Proposed abolition of Part 101 spectrum efficiency rules • Earth Station Vessels (reconsideration phase) • Proposed power increase at 57-64 GHz • Use of 18 GHz for “final RF link” to deliver video • Proposed changes at 37.0-40.0 and 42.0-42.5 GHz. • All are due (or overdue) for FCC action.

  8. Thank you! Mitchell Lazarus | 703-812-0440 | lazarus@fhhlaw.com

More Related