Pannon Power – Biomass Power Plant project combustion flow measurement using a diff.pressure Pitot tube and a unique calibration method. Manninger Gusztav Flowell Kft. Project , measuring method intorduction. Measuring problem. Calibration method. Possibilities. Technical

mulan
Download Presentation

Manninger Gusztav Flowell Kft.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pannon Power – Biomass Power Plant project combustion flow measurement using a diff.pressure Pitot tube and a unique calibration method Manninger Gusztav Flowell Kft.

  2. Project , measuring method intorduction Measuring problem Calibration method Possibilities Technical Solution Results

  3. 35 MW-capacity – biomass 100% greenenergyforthetotalcentralheatingdemand of city PÉCS

  4. DFL100 flowmeters Venturi meter

  5. Venturi details:

  6. What’stheproblem ? • Old Powerstation building – newplant – fixed isometric • Therecannot be measuredany flow ! • thereare no straightpipelines • Buttherearevalvesjustahead of themeasuringpoints • And wehaveelbows…….whichshouldavoid ! lookattheisometric:

  7. Measuring principle Overvie

  8. Overview • Flow rate measurement with a probe by the principle of differential pressure method • Evaluation with the Microprocessor Unit D-FL 100-10 (optional) • Adjustable parameters • Load-independent current for line recorder and indicator instrument

  9. DFL100 aplicable: • stack diameter 0.3 to 8 m (Probe I: 0.3 to 2 m, Probe II: 2 to 4 m; Probe III: 4 to 8 m) • minimum gas velocity 3 m/s • for gases above dew point • temperatures up to 400°C / stainless steel 1.4571 • temperatures up to 700°C / Inconel 600 • special materials for acid gases / Hastelloy C276 • accuracy guaranteed better than ±2% according to VDI 2066 • transmitter mountable on the probe or separately • cross-over cock for zero-point control and backflow purging • long maintenance intervals > 3 month • dust loads up to 150 mg/nm3 without automatic purging systems • microprocessor evaluation unit for temperature and absolute pressure compensation • very robust system • transmitters are factory calibrated • easy to install

  10. Accuracy…

  11. Possibilities • Low flow, hugediameter, lookingforthecheepestsolution – asitusedto be • No ultrasonicpossibilitiesjustbecausetheverylowpressure • No more dploss is allowed • Shortdeliverytime THE ONLY POSSIBILITY A DP MEASURING • NO CHANCE FOR VENTURI • AVERAGING PITOT TUBE - WITH AN UNIQUE CALIBRATION MADE BY

  12. Calibrationmethod • There is a VENTURI mastermeterin a commonpipe line • d=1000 mm • D=2000 mm • L=11873 mm • Allthe 6 pcs. of DURAG DFL100 probecan be easilyblindid • Differentflowrates – fastresponse • Smalltype of shutoffvalves – forblindingallthe 6 DFL100 • Measuringpointswithopening/closingpipesections – calibratingtothemastermeter, and tothouseprobeswhichareinstalledperfectly 3 probesarepercfectlyinstalled • 3 probes had no spaceforthe right installation

  13. Someresoultsatdifferent flow rates……

  14. Someresoultsatdifferent flow rates……

  15. Some more……atdifferentoperatingpoints

  16. Someresoultsatdifferent flow rates……

  17. Calibrationcurves

  18. www.flowell.hu www.jovoert.eu

  19. Thank you !