1 / 11

NF activities at IC (part II)

NF activities at IC (part II). m. apollonio. 1. FETS MICE - NF Decay Rings. Key issues for Neutrino Factory: High-power target Ionisation cooling Rapid (large acceptance) acceleration RF cavity (in magnetic field and superconducting). 2.

murphyjames
Download Presentation

NF activities at IC (part II)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NF activities at IC (part II) m. apollonio IPPP- Imperial College, London 1

  2. FETS • MICE • - NF Decay Rings • Key issues for Neutrino • Factory: • High-power target • Ionisation cooling • Rapid (large acceptance) acceleration • RF cavity (in magnetic field and superconducting) IPPP- Imperial College, London 2

  3. FETS (RAL) L. Jenner, S. Jolly, A. Kurup, D. Lee, K. Long, J. Pozimski, P. Savage • High Power (5MW) Pulsed Proton Source (50 Hz, 3 MeV) • H- Penning source: 65 kEV, 60 mA, 2ms pulse • LEBT: solenoidal channel • RFQ: 1st acceleration stage • (65 keV  3 MeV) • Chopper: prepares the beam for next acceleration (in bunches) • MEBT: Quadrupoles + RF bunching • diagnostic: conventional & non destructive laser: beam profile + emittance The design constraints and cost of a large facility like the neutrino factory, depends on the quality of the beam that is produced in the Front End. It is therefore essential to understand what the beam looks like after the chopper. The Front End Test Stand will be equipped with a set of conventional diagnostic devices (e.g. current transformers, Spectrometers, etc.) and newly developed, non-destructive laser based system to measure the beam profile and quality. IPPP- Imperial College, London 3

  4. MICE M Apollonio, P J Dornan, J Leaver, K Long, J Sedgbeer, G Barber, A Jamdagni, A Fish, A Dobbs, A Alekou • Demonstrate feasibility of ionisation coolingin a variety of initial momenta/emittances • cooling := emittance reduction • emittance := beam occupancy in transverse phase space (x,x’,y,y’) • need to be FAST: tm = 2.2 msec  use energy loss by ionisation • recover Pz by means of cavities m p Proton Cooling x’ x acceleration-RF LH2 absorber IPPP- Imperial College, London 4

  5. e2 e1 MICE: theory to practice … PId DETECTORS TRACKERS COOLING SECTION measure: eT before and after the channel (De to 0.1%) & transmission of the channel IPPP- Imperial College, London 5

  6. MICE @ RAL • IC active in: • tracker(s) • ISIS beam studies • re-design of new target • m-beam line IPPP- Imperial College, London 6

  7. Q1 Q2 Q3 D1 Q4 Q5 Q6 Q7 Q8 Q9 D2 MICE @ RAL vBEAMLINE: US/DS in place v DETECTORS/ MONITORS: in place and in DAQ chain v LINDE Refrigerator v MLCR xTARGET x SOLENOID: still in progress MLCR LINDE IPPP- Imperial College, London 7

  8. MICE @ RAL re-design of the Target (and control) IPPP- Imperial College, London 8

  9. Decay Rings for the NF • S. M. H. Alsari, M. Apollonio, M. Aslaninejad, P. Dornan, K .Long, S. Jolly, • Kurup, J. Pasternak, J. Pozimski, • P. Savage, D. Lee Pm = 25 GeV/c L=1608 m High b straights Decay Ring Twiss Parameters Resonance diagram with/without sextupole correction Tracking studies of Dynamic Aperture

  10. Decay Rings for the NF G4Beamline reproduction of the Decay Ring muons let decay electrons straight section matching section arc Dipole virtual detector planes QD QF IPPP- Imperial College, London 10

More Related