1 / 6

JAA JIP Working Group

JAA JIP Working Group. OST progress information. Workgroup members. Mario Moura (chairman, INAC) Bob Jones (CAA UK) Svein Austheim (CAA NO) Michael O’Brien (CAA Malta) Andreas Scholz (LBA) Waldemar Krolikowski (ULC) Thierry Allain (DGAC) Jaap Meijer (CAA NL)

Download Presentation

JAA JIP Working Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JAA JIP Working Group OST progress information

  2. Workgroup members • Mario Moura (chairman, INAC) • Bob Jones (CAA UK) • Svein Austheim (CAA NO) • Michael O’Brien (CAA Malta) • Andreas Scholz (LBA) • Waldemar Krolikowski (ULC) • Thierry Allain (DGAC) • Jaap Meijer (CAA NL) • Sander Starreveld (CAA NL)

  3. Focus of the WG • Revise the OPST process • Prepare for next round of visit; • Mature and expand OPST system. • Revise the JIP • Quality program for authorities; • Guidance on training of inspectors; • Guidance on inspection manuals

  4. Revised OPST process • Team briefing by JAA on items to be verified during second OPST visit; • At NAA, more focus on: • Method and procedures for continued supervision; • Method for assessing operational approval requests; • Training on (flight) operations inspectors • At Operator, more focus on: • NAA, since operator is the sample product; • Implementation of supervision by NAA

  5. Revised OPST checklists • OPST checklist of three parts: • Part 1 – the NAA in general • Part 2 – the NAA’s supervision on JAR-OPS 1 • Part 3 – the NAA’s supervision on JAR-OPS 3 • Checklists Part 2/3 include one operator as a sample product • Checklists are standardized and brought in line with ICAO

  6. Examples • References to JAR-OPS and JIP chapters included; • Questions more detailed; • Examples of evidence to be reviewed expanded; • Status of implementation included

More Related