60 likes | 181 Views
JAA JIP Working Group. OST progress information. Workgroup members. Mario Moura (chairman, INAC) Bob Jones (CAA UK) Svein Austheim (CAA NO) Michael O’Brien (CAA Malta) Andreas Scholz (LBA) Waldemar Krolikowski (ULC) Thierry Allain (DGAC) Jaap Meijer (CAA NL)
E N D
JAA JIP Working Group OST progress information
Workgroup members • Mario Moura (chairman, INAC) • Bob Jones (CAA UK) • Svein Austheim (CAA NO) • Michael O’Brien (CAA Malta) • Andreas Scholz (LBA) • Waldemar Krolikowski (ULC) • Thierry Allain (DGAC) • Jaap Meijer (CAA NL) • Sander Starreveld (CAA NL)
Focus of the WG • Revise the OPST process • Prepare for next round of visit; • Mature and expand OPST system. • Revise the JIP • Quality program for authorities; • Guidance on training of inspectors; • Guidance on inspection manuals
Revised OPST process • Team briefing by JAA on items to be verified during second OPST visit; • At NAA, more focus on: • Method and procedures for continued supervision; • Method for assessing operational approval requests; • Training on (flight) operations inspectors • At Operator, more focus on: • NAA, since operator is the sample product; • Implementation of supervision by NAA
Revised OPST checklists • OPST checklist of three parts: • Part 1 – the NAA in general • Part 2 – the NAA’s supervision on JAR-OPS 1 • Part 3 – the NAA’s supervision on JAR-OPS 3 • Checklists Part 2/3 include one operator as a sample product • Checklists are standardized and brought in line with ICAO
Examples • References to JAR-OPS and JIP chapters included; • Questions more detailed; • Examples of evidence to be reviewed expanded; • Status of implementation included