Hemet High Phase 2 Modernization & Expansion April 19 th , 2012: Theater –(l) Pathway linking the two projects together was poured this week. (r) Front of Theater.
E N D
Hemet High Phase 2 Modernization & ExpansionApril 19th, 2012: Theater –(l) Pathway linking the two projects together was poured this week. (r) Front of Theater.
April 19th, 2012: Theater – (l): Electric set pipe battens have been installed.(r): Black box pipe grid installation in progress.
April 19th, 2012: Theater – (l): Soffit drywall nearing completion and ceiling cloud framing in the seating area. (r)-Roll up doors were installed and lighting is being installed at the scene shop.
April 19th, 2012: (l): Vinyl flooring tile is being installed in the classrooms. Work center pictured. (r)-Fumehood