Hemet High Phase 2 Modernization & Expansion April 19 th , 2012: Theater –(l) Pathway linking the two projects together was poured this week. (r) Front of Theater.

myriamc
Download Presentation

153011 aa5e18b1 ad20 422e 906e 62520e57a5aa

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hemet High Phase 2 Modernization & ExpansionApril 19th, 2012: Theater –(l) Pathway linking the two projects together was poured this week. (r) Front of Theater.

  2. April 19th, 2012: Theater – (l): Electric set pipe battens have been installed.(r): Black box pipe grid installation in progress.

  3. April 19th, 2012: Theater – (l): Soffit drywall nearing completion and ceiling cloud framing in the seating area. (r)-Roll up doors were installed and lighting is being installed at the scene shop.

  4. April 19th, 2012: (l): Vinyl flooring tile is being installed in the classrooms. Work center pictured. (r)-Fumehood