30 likes | 266 Views
SHORT TERM OPEN ACCESS(STOA) RATES. NORTHERN REGION. 516.03 (2.2). 1795.11 (7.5). NORTH-EASTERN REGION. NR-ER. 447.73 (1.9). WR-NR. ER-NER. EASTERN REGION. 859.05 (3.6). 433.09 (1.8). 434.42 (1.8). WR-ER. WESTERN REGION. 359.68 (1.5). WR-SR. SR-ER. 1128.39 (4.7).
E N D
SHORT TERM OPEN ACCESS(STOA) RATES NORTHERN REGION 516.03 (2.2) 1795.11 (7.5) NORTH-EASTERN REGION NR-ER 447.73 (1.9) WR-NR ER-NER EASTERN REGION 859.05 (3.6) 433.09 (1.8) 434.42 (1.8) WR-ER WESTERN REGION 359.68 (1.5) WR-SR SR-ER 1128.39 (4.7) 2433.39 (10.1) SOUTHERN REGION Notes:i) The indicated STOA Rates are in Rs./MW/Day. ii) The figures shown in bracket correspond to the STOA Rates in Paise/Unit. 614.15 (2.6) SRLDC, BANGALORE MARCH 2006
SHORT TERM OPEN ACCESS(STOA) RATES RS./MWHR NORTHERN REGION WHEELING REGION Rs.90/MWHR NORTH-EASTERN REGION ADJACENT REGION Rs.60/MWHR EASTERN REGION INTRA REGION Rs.30/MWHR WESTERN REGION SOUTHERN REGION SRLDC, BANGALORE MARCH 2006
NORTHERN REGION NORTH-EASTERN REGION EASTERN REGION WESTERNREGION SOUTHERN REGION SHORT TERM OPEN ACCESS(STOA) RATES Rs./MWHR BILTERAL COLLECTIVE