Construction Analysis during the Design Process

Construction Analysis during the Design Process. www.ddss.arch.tue.nl Bauke de Vries. 4D-CAD. Linking building components with construction activities Manual task of the construction planner Dedicated systems: NavisWorks, 4D Suite, … Advantages: Simulation, Visualization. Challenge.

Download Presentation

Construction Analysis during the Design Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Construction Analysis during theDesign Process www.ddss.arch.tue.nl Bauke de Vries

  2. 4D-CAD • Linking building components with construction activities • Manual task of the construction planner • Dedicated systems: NavisWorks, 4D Suite, … • Advantages: Simulation, Visualization

  3. Challenge Automation of the planning process. Advantages: • Independency from the planner • Quick first concept plan

  4. Implementation

  5. Construction algoritms Analysis by object name: Walls are bearing floors, colums are bearing beams, etc.

  6. Construction algorithms Analysis by object elevation: Object with a lower elevation is bearing an object with a higher elevation

  7. Construction algorithms Analysis by directed graph: Each object is a node in a connection graph.

  8. Construction algorithms Analysis by object adjacency: Each object is a node in a topological graph

  9. Construction analysis Object of anlysis

  10. Construction analysis Move down – Inleiding – Oriëntatie – Doelstelling van het onderzoek – De algoritmen – Implementatie – – Case Study – Reactie uit het bedrijfsleven – Conclusie en Aanbevelingen – Einde –

  11. Construction analysis The green objects have an intersection in the vertical direction with the red object – Inleiding – Oriëntatie – Doelstelling van het onderzoek – De algoritmen – Implementatie – – Case Study – Reactie uit het bedrijfsleven – Conclusie en Aanbevelingen – Einde –

  12. Construction analysis The red object has in intersection with the green objects in the horizontal direction

  13. Construction analysis Example: Objects adjacent to floor

  14. Pilot study

  15. Planning comparison Real planning Generated planning

  16. Differences • Concurrency whenever possible • Unlimited resources • Construction method

  17. Complete process

  18. Experiences • Model preperation through clash detection • Generated planning 2 months longer than real planning over a a period of 1 ½ year • Suitable for a quick first guess • Further development of: Construction method, Humen resources, Material resources