50 likes | 206 Views
PhD Achievements and Plans. Maximus Byamukama. Administrative Progress 2016. Proposal is almost finished. Hope to submit by mid September. Hope to have full admission by annual general meeting. Academic Progress 2016. Had interview with Milton on several issues :
E N D
PhD Achievements and Plans Maximus Byamukama
Administrative Progress 2016 • Proposal is almost finished. Hope to submit by mid September. Hope to have full admission by annual general meeting
Academic Progress 2016 • Had interview with Milton on several issues : • Main challenge is no logs at UNMA • (failed stations, reasons, cost of fixing) . Will have to estimate • One paper out early this year • 2nd paper rejected – to be improved after ATMEGA256RFR2 power experiments • 3rd paper abstract submitted to UbuntuConnect: Leveraging inter-institutional networks to facilitate transmission of data from AWS
Plans – 2nd half of 2016 • Finalize with ATMEGA sink/gateway + Contiki • Rectify paper • 3 new undergrad students • Basic gateway functionality in ATMEGA (receive, save locally) and power minimization + survey of better GPRS options • Wireless Sneakernet Protocol for AWS • Fixing digital rainguages for UNMA • Defend proposal