PEAKING OF WORLD OIL PRODUCTION: IMPACTS, MITIGATION, RISK MANAGEMENT

PEAKING OF WORLD OIL PRODUCTION: IMPACTS, MITIGATION, RISK MANAGEMENT. Robert L. Hirsch, SAIC Roger Bezdek, MISI Robert Wendling, MISI Presentation to ASPO May 2005 Based on a Study for the U.S. Department of Energy. THIS PRESENTATION. THE PROBLEM LEARNING FROM EXPERIENCE

nalani
Download Presentation

PEAKING OF WORLD OIL PRODUCTION: IMPACTS, MITIGATION, RISK MANAGEMENT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PEAKING OF WORLD OIL PRODUCTION:IMPACTS, MITIGATION, RISK MANAGEMENT Robert L. Hirsch, SAIC Roger Bezdek, MISI Robert Wendling, MISI Presentation to ASPO May 2005 Based on a Study for the U.S. Department of Energy

  2. THIS PRESENTATION • THE PROBLEM • LEARNING FROM EXPERIENCE • TRANSPORTATION FLEET LIFETIMES • MITIGATION OPTIONS • THREE MITIGATION SCENARIOS • PRUDENT RISK MANAGEMENT SAIC / MISI

  3. THE PROBLEM: PEAKING OF WORLD CONVENTIONAL OIL PRODUCTION(Not all of the latest forecasts) • ProjectionSource • 2006-2007 Bakhitari, A.M.S. • 2007-2009 Simmons, M.R. • After 2007 Skrebowski, C. • 2008 Campbell / ASPO • Before 2009 Deffeyes, K.S. • Before 2010 Goodstein, D. • After 2010 World Energy Council • 2010-2020 Laherrere, J. • 2016 EIA nominal case • After 2020 CERA • 2025 or later Shell • ---------------------------------------------------------------- • No visible peak Lynch, M.C. 2000 2010 2020 2030 SAIC / MISI

  4. LEARNING FROM EXPERIENCE • North American natural gas • U.S. Lower 48 states oil production • Economic impacts in 1973 & 1979 SAIC / MISI

  5. EXPERIENCE: NORTH AMERICAN NATURAL GAS • Expertsoverestimated North American natural gas reserves & future production as late as 2001. • National Petroleum Council - 1999 • DOE EIA - 1999 • Cambridge Energy Research Associates - 2001 • U.S. natural gas production is now flat / in decline. • Natural gas & oil geology have similarities. • If wrong on natural gas, what’s the risk on oil? SAIC / MISI

  6. EXPERIENCE: U. S. LOWER 48 OIL PRODUCTION Dramatic Improvement in Oil Field Technology 3.5 Production 3.0 2.5 80 PRODUCTION (Billions of Barrels per Year) 2.0 PRICE (2003 $ per barrels) 1.5 Price 1.0 0.5 0 0 • 1950 1960 1970 1980 1990 2000 High prices & advanced technology did not reverse trends! SAIC / MISI

  7. EXPERIENCE: MAJOR OIL INTERRUPTIONS • Impacts of world oil production peaking are exemplified by the 1973 & 1979 oil interruptions. • + Inflation + Recession • + Unemployment + High interest rates • 1973 & 1979 were relatively brief. • World oil peaking impacts could last a decade or more. • The world has never faced a problem like oil peaking. SAIC / MISI

  8. TRANSPORTATION EQUIPMENT • U.S. 2003 consumption: ~20 MM bpd • ~25% of world oil demand • ~Two thirdsused in transportation • The U.S. transportation fleet • + Very large • + Huge investment • + Evolves slowly Details SAIC / MISI

  9. U.S. TRANSPORTATION FLEETS • Fleet Size Median Cost to Replace • Lifetime Half the Fleet • (Years) (2003 $) • Automobiles 130 million 17$1.3 trillion • Light Trucks, 80 million 16$1 trillion • SUVs,etc. • Heavy Trucks, 7 million 28$1.5 trillion • Buses, etc. • Aircraft 8,500 22$.25 trillion SAIC / MISI

  10. TRANSPORTATION EQUIPMENT CHANGES • Large efficiency improvements possible in some fleets, smaller in others. • Some fuel switching possible in the short term, more longer term. Change is slow & expensive. Fuel must be provided for existing fleets. SAIC / MISI

  11. THREE MITIGATION SCENARIOS • Scenario I - No action until peaking occurs • Scenario II - Mitigation started 10 years before peaking • Scenario III - Mitigation started 20 years before peaking Assumptions: • All mitigation initiated immediately • Crash program implementation Optimistic limiting case SAIC / MISI

  12. MITIGATION OPTIONS Commercial or near-commercial technologies to impact LIQUID FUEL MARKETS • Vehicle Fuel Efficiency • Gas-To-Liquids (GTL) • Heavy Oil / Oil Sands • Coal Liquefaction • Enhanced Oil Recovery (EOR) SAIC / MISI

  13. OPTIONS NOT INCLUDED OptionReasoning • Nuclear • Wind ……….. ELECTRIC / NOT LIQUID FUELS • Solar • Shale Oil……………... Not commercial • Biomass……………. Not economic • Hydrogen……………Neither ready nor economic SAIC / MISI

  14. MITIGATION ASSUMPTIONS • VEHICLE FUEL EFFICIENCY -- 30%, then 50% LDV improvements • GAS-TO LIQUIDS -- 2x recent GTL projections (LNG competes) • HEAVY OIL/OIL SANDS -- 2-2.5x recent projections • COAL-TO-LIQUIDS -- Five new 100,000 bpd plants/year • ENHANCED OIL RECOVERY (EOR) -- Paced by CO2 availability SAIC / MISI

  15. DELAYED WEDGES APPROXIMATION Impact Barrels/ Day Prepare Produce Vehicle Fleet Fuel Saved Actual Wedge Approximation 10 20 30 0 Time - Years SAIC / MISI

  16. WEDGE VALUES Preparation Impact 10 Years Delay Later Mitigation Option(Years)(MM bpd) • Vehicle Efficiency 3 2 • Gas-To-Liquids 3 2 • Heavy Oils / Oil Sands 3 8 • Coal Liquids 4 5 • Enhanced Oil Recovery 5 3 Potential contributions vary greatly. SAIC / MISI

  17. SUM OF WEDGES 30 E O R 20 I m pac t C o a l Li q ui d s ( M M b p d ) H eav y Oil 10 G T L E ff. Ve h icle s 0 0 5 10 15 Y ea r s A ft e r Cr as h P r o g r a m I n iti a tio n SAIC / MISI • Delay, then rapid growth • Roughly 25 MM bpd at 15 years after crash program start.

  18. Production (Billions of Barrels per Year) 1980 1990 2000 1950 1960 1970 Year U.S. LOWER-48 OIL PRODUCTION PEAKED & DECLINED 3.5 3.0 Actual (EIA) 2.5 Approximation 2.0 1.5 1.0 0.5 0 A huge, complex & geologically varied oil province. Used as a surrogate for the world. SAIC / MISI

  19. 120 100 80 PRODUCTION (MM bpd) 60 40 20 0 -20 0 +10 +20 -10 YEARS BEFORE / AFTER OIL PEAK WORLD OIL SUPPLY & DEMAND:LOWER 48 PRODUCTION PATTERN & EXTRAPOLATED DEMAND GROWTH Extrapolated Demand -Growing World Economy Shortage L 48 production pattern • Assumed: • Demand @ 2% • Oil Decline @ 2% • Peak @ 100 MM bpd • (Not a prediction) SAIC / MISI

  20. SCENARIO I: MITIGATION @ PEAKING 120 Mitigation 100 Shortage 80 PRODUCTION (MM bpd) 60 40 20 0 -20 0 +10 +20 -10 YEARS BEFORE / AFTER OIL PEAK SAIC / MISI

  21. SCENARIO II: MITIGATION 10 YEARS BEFORE 120 Mitigation 100 Shortage 80 PRODUCTION (MM bpd) 60 Start Oil Decline Delayed 40 20 0 -20 0 +10 +20 -10 YEARS BEFORE / AFTER OIL PEAK SAIC / MISI

  22. SCENARIO II: MITIGATION 20 YEARS BEFORE 120 Mitigation 100 80 PRODUCTION (MM bpd) 60 Oil Peaking Further Delayed 40 Start 20 0 -20 0 +10 +20 -10 YEARS BEFORE / AFTER OIL PEAK SAIC / MISI

  23. SCENARIOS ANALYSIS CONCLUSIONSBasis: Immediate crash program mitigation I. Wait for peaking II. Start 10 years early III. Start 20 yearsearly • Oil shortages largest, longest lasting • Delays peaking; still shortages • Avoids the problem; smooth transition SAIC / MISI

  24. RAPID OIL PRODUCTION DECLINES AFTER PEAKING HAVE BEEN FORECAST EIA (Hakes, J.) ……………………………..… ~ 8% Saudi Aramco (Al-Husseini, S)…………….. 3-5% ExxonMobil………………………………..... 4-6% On a base of 100 MM bpd, 3-8% declines correspond to 3-8 MM bpd annual declines. Mitigation would be much more difficult! SAIC / MISI

  25. WORLD OIL PEAKING FORECASTS • ProjectionSource • 2006-2007 Bakhitari, A.M.S. • 2007-2009 Simmons, M.R. • After 2007 Skrebowski, C. • 2008 Campbell / ASPO • Before 2009 Deffeyes, K.S. • Before 2010 Goodstein, D. • After 2010 World Energy Council • 2010-2020 Laherrere, J. • 2016 EIA nominal case • After 2020 CERA • 2025 or later Shell • ---------------------------------------------------------------- • No visible peak Lynch, M.C. 2000 Now 2010 Now + 10 2020 Now + 20 2030 SAIC / MISI

  26. PRUDENT RISK MANAGEMENT Cost of Error Premature Start Time - 20 Years Scenario III - 10 Years Scenario II 0 Years Scenario I SAIC / MISI

  27. SUMMARY & CONCLUSIONS • Oil peaking timing is uncertain. • It may be soon. • “Soon” is less that 20 years hence. • It’s a world liquid fuels problem. • A number of mitigation technologies are ready. • With timely mitigation, economic damage minimized. • Prudent risk management = early action, not reaction after the fact. SAIC / MISI