An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Asset Management

  2. Asset Inventory • Inventory of assets maintained by the agency • Critical for determining assets to be managed • Foundation for building annual budget

  3. Asset Inventory GIS Map Feature Extraction Barrier Wall Signs Mowing Area Rumble Strips Pavement Markings

  4. Asset Inventory • Features extracted to database

  5. Asset Inventory • Inventory imported to MMS • Budget distributed to counties based on inventory

  6. Asset Management

  7. Level of Service • Defines the amount of maintenance required to manage assets at a specified level • Should be supported at all levels of management within the agency • TDOT needs to tie Level of Service to the Condition Assessment to ensure that appropriate funding and resources are allocated to achieve target goals

  8. Level of Service • Percent of assets maintained per year to achieve desired service level • Example: • Percent of signs replaced • Percent of pavement miles resurfaced • Frequency of performed maintenance on an asset • Example: • Number of mowing and litter cycles

  9. Level of Service

  10. Asset Management

  11. Condition Assessment • How well are we maintaining our infrastructure? • Quantitative evaluation of the condition of assets • Should be analyzed and used to reallocate resources and funding to meet your asset management goals

  12. Condition Assessment • TDOT uses a condition assessment program called the Maintenance Rating Index (MRI) • Random sample of roadway network • Approximately 6% of roadway miles evaluated each year • 7,107 1/10th mile segments assessed in FY 2010

  13. Condition Assessment • Evaluates all roadway characteristics monthly • Each characteristic has weighting factor used to generate a score • Pass/Fail based on whether it meets the minimum condition standard • Score from 0 to 100 • Target score is 90

  14. Condition Assessment • 10% of segments evaluated by third party consultant for quality assurance • In-house scores ~ 90 • QA scores ~ 82 • Red trend line should match up to black line if QA & In-house scores were similar • Red line shift indicates higher In-house scores • Concentration of points with In-House score of 100 & QA score considerably lower is a concern In-House vs. QA Score

  15. Condition Assessment Strengths Weaknesses • Satisfies GASB 34 requirement • Quantitative evaluation instead of subjective opinion • Provides for opportunity to find deficiencies that windshield inspection may miss • Data indicates that In-House self-evaluation has lead to elevated scores • May need to consider using impartial third party to perform inspections in the future

  16. Asset Management

  17. Maintenance Management System • Implemented in July 2005 • Better Accountability • Ability to compare In-House Cost vs. Contract Cost • Provides documentation for: • Liability Claims • Federal Reimbursement • FEMA • FHWA – Emergency Relief • Approx. $8 Million for rockslides in 2009 & 2010 • Approx. $40 Million for May 1-2, 2010 flood

  18. Future • Link Condition Assessment to Level of Service & Budget • Letter Grade Scale for Level of Service to simplify the communication of current condition and resource needs to achieve goals Source: North Carolina DOT, 2006 Report on the Condition of the State Highway System

  19. Future • 3D mesh model of 13th Ave. @ I-40 in Downtown Nashville built from LiDAR data

  20. Future • Street view

  21. Future • 3D mesh with photolog overlay

  22. Future • Fly through 3D model instead of driving through photolog

  23. Future • Pan/Tilt/Zoom • View roadway assets from any angle

  24. Future • Measurement tool allows for measurement of objects such as lane width, sign dimension, cut slope height, vertical/horizontal clearance, etc.