Agenda

Agenda. Background Information Planning Process Project Scope Timetable Financing Plan Benefits Questions & Answers (45 minutes) Plan Commission Public Hearing on Plan. The Marquette Plan. Recreational access along the lakeshore New trails as close to the lakeshore as possible

naoko
Download Presentation

Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agenda • Background Information • Planning Process • Project Scope • Timetable • Financing Plan • Benefits • Questions & Answers (45 minutes) • Plan Commission Public Hearing on Plan

  2. The Marquette Plan • Recreational access along the lakeshore • New trails as close to the lakeshore as possible • Minimizing private development within 200 feet of the shoreline

  3. The Marquette Plan - Whiting • Expand Whiting Park • Improve park access • Connect Lake George Trail to lakeshore • Improve shoreline access and natural areas • Focus on mixed-use development

  4. Complexity • Multi-Agency Partnership • City of Whiting (several agencies) • City of Hammond (several agencies) • Lake County Parks Department • Federal Government - Congressman Visclosky • BP • Regional Development Authority (RDA) • School City of Whiting • Calumet College of St. Joseph

  5. Complexity • Multi-Agency Approval Needed • Local Boards and Commissions • Department of Natural Resources • Army Corps of Engineers • IDEM • Indiana Brownfield Program • 3 Separate Railroads • Multiple Project Coordination • Hammond-Whiting Water Project (saved $500K)

  6. The Planning Process

  7. The Planning Process • Plan Commission to consider adopting Lakefront Master Plan tonight • Plan then sent to the City Council for consideration • City to make presentation to the RDA • Plan Commission to finalize update of the City’s Comprehensive Master Plan • All work funded by an RDA Grant

  8. Charrette Workshop • Held July 10 – 12th 2008 at Calumet College • Mini planning process condensed into a weekend • Over 70 attendees attended at least two of the three days

  9. Charrette Workshop Challenges • 100’s of great ideas presented • Phasing Plan created to allow each idea to be considered in Future Phases of Plan • As funding becomes available, we will continue to add amenities and features • Our largest challenge was to draw the line in the sand to determine which ideas were included in the final plan

  10. Goals • Provide for connectivity for pedestrians, bicycles, watercraft and automobile • Link to the regional multi-use trail network • Improve upon natural habitat opportunities along the shoreline • Improve human connection to the lakefront through better access and amenities • Preserve the park’s history and value to the community

  11. Goals • Improve upon the park as an economic asset and attractor • Provide for year-around recreational opportunities • Expand opportunities for additional residential and commercial development • Improve connection between the park and 119th St. • Separate passive recreation with active (competitive) recreation

  12. Long-Range Master Plan

  13. Preliminary Phase • Utility Infrastructure • Water, Sewer, Gas, Power • Bike Trail – George Lake to Front Street • Public Works Facility relocation • Baseball Field relocation • Property Acquisition – ROW • Engineering, Design & Permitting

  14. Preliminary Phase – Bike Trail POCKET PARK & TRAIL RESIDENTIAL DEVELOPMENT OPPORTUNITY HAMMOND TRAIL BRIDGE WHITING TRAIL PARK OPPORTUNITY

  15. Preliminary Phase - Bike Trail

  16. Phase I Plan

  17. Phase 1 Highlights • Replace existing rubble shoreline • New 2-tiered Boardwalk-Promenade with 4 lookout points along shore • Improve Whihala boat launch & harbor • New City Museum – Multi-use facility • Improve 119th & Front Street intersection • Improve Park Road - Turnaround loop • Close 117th Street to vehicles – “Quiet Zone”

  18. Phase 1 Highlights • Additional walking paths and connections • Rehabilitate existing park pathways • Improve Front & 117th gateways • Remove W-R Boat Club harbor • New concession & restroom facility • Improve Pavilion area & concert seating • Renovate Gun Club building • New parking areas

  19. Phase 1 Highlights • Standard Diamonds improvements • Playground expansion & improvements • Improve 117th and Oliver intersection • Major landscaping, lighting, signage and communications service improvements • Lakefront Gazebo – entertainment venue • 200’ permanent fishing pier • Extend Front Street trail to Park

  20. Promenade & Gazebo

  21. Gazebo

  22. View Towards Chicago Skyline

  23. Phase II Plan

  24. Phase 2 Highlights • Eastside lake fill restoration project – natural beach and dune habitat area • Enhance gathering places along lakeshore • Formal Garden near the new Gazebo • Activity Centers – Bean Bags, Bocce Ball, Picnic Shelters, etc. • Whihala Boat Launch parking enhancements • Pavilion enhancements

  25. Picnic Shelters

  26. Future Phases of the Plan

  27. Future Phase Highlights • Not included in current Financing Plan • Expanded Playgrounds - Splash Pad • Extend Park Road to the south side of Park • Pedestrian Bridge • Additional Park Buildings • Ice Rink • Boat Harbor Memorial Park • Marina???

  28. Year-around Activities

  29. Timetable • Preliminary Phase – underway • Phase 1 – Spring 2010 through 2011 • Phase 2 – Spring 2010 through 2012? • Future Phase – As funds become available

  30. Financing Plan • Largest Project in City’s History • Final Project Scope to be determined by financing (RDA grant) • Total Scope as presented = $45 MILLION • No residential property tax funding needed • Budget dilemma: • Property tax budget under extreme pressure • Can’t pass up the opportunity to leverage grant money to make these improvements

  31. Why is this Project Important? • Stimulates investment and new tax base • Greatly enhances our Quality of Life • Significant Regional Importance • Positive Impact to Property Values • Environmental Restoration • Sets the Table for Future “Clean” BP Development Opportunities

  32. Financing Plan • Project Funding Sources • $3,475,000 Federal Grants • $2,600,000 RDA Bike Trail & Planning Grant • $2,350,000 BP Foundation Grant • $1,000,000 Miscellaneous Grants • $1,000,000 TIF Reserves • $??? RDA Implementation Grant • $??? TIF Bonds

  33. Intangible Benefits • Increase in Fees are expected to offset additional operational costs • Minimal impact to the City’s Budget • Debt service or Operations • “Quiet Zone” improvements – “Priceless” • Enhanced Retail Business Climate • Secondary Development Opportunities

  34. Secondary Development • Residential Growth • New Condominiums • 117th Street • Senior Condos • Existing Housing Inventory investment • Commercial Growth • Season Opportunities • Hotel? • BP Opportunities

  35. Mixed-use and Townhomes

  36. Closing • Why Did We Delay the Plan Release? • Very Complex Project • I needed to be confident that: • The scope was realistic and doable • The Funding Plan was solid • That we maximized our grant opportunities • That we didn’t hinder the BP OCC Project • We needed to get it right, the first time • We are now ready to pull the trigger • Thank American Structurepoint – Staff - Boards

  37. Q&A • Questions and Answers?