Christian Brothers University650 East Parkway S, Memphis TN 38104 MAESC CONFERENCE - 2005 Provisioning the Power System for the Porter Farms P.D. By: Marnelli Pascual
Overview • What is Porter Farms P.D.? • Preliminary Designs • Loop System • Specifications • Calculations • Cost Analysis • Project Summary
Porter Farms P.D. • Consists of 2 Areas • Area 1, Subdivision with 69 lots • Area 2, Apartments with 52 units, plus 1 clubhouse • Located in Collierville, TN
Project Stages • Stage 1 • Develop Area 2, Apartments • Stage 2 • Develop Area 1, Subdivision
Existing Power Sources 3Ø 1Ø 3Ø
Design 1 – Two UG Loops BORE UNDER RAILROAD
Design 1 (cont’d) BORE UNDER THE STREET
Design 1 (cont’d) • Advantages • Feeds are from the closest sources • No tree trimming/removal required • Problems Encountered • Railroad approval takes at least 90 days • Minimum railroad crossing fee of $75,000
Design 2 – Two UG Loops NEW 1Ø OVERHEAD LINE LAKE
Design 2 (cont’d) • Problems Encountered • Crossing fee and approval from Railroad company required • City of Collierville and the homeowner’s association objected to the design • Involves tree trimming/removal
Design 3One UG Loop UNDERGROUND PRIMARY TEMPORARY OVERHEAD LINE
Design 3 (cont’d) BORE UNDER THE STREET
Design 3 (cont’d) • Advantages • No railroad fee or approval required • No tree trimming/removal • Problem Encountered • Cost of $10,000 for the temporary electric
UG Single Loop • Calculated Loads • Apartments = 525kVA • Subdivision = 775kVA • Total = 1300kVA • MLGW Requirement • Maximum load = 1320kVA
Transformer Isolation DISCONNECT
Specifications • Fuse: (2) 100 A • Transformers Used (Area 1 & 2) • (3) 50 kVA • (14) 75 kVA • (1) 100 kVA • Cables & Conduits • Primary: #2 insulated copper inside 2” pvc conduit • Secondary: 350 kCM triplex inside 3” pvc conduit • Meter Sockets (Apartments) • (12) 6-Gang Meter • (2) 2-Gang Meter • (1) Single Meter
Specifications (cont’d) • 6-Gang Meter Socket RISER ENTRY
Specifications (cont’d) • Location of Facilities • Riser Location
Specifications (cont’d) • Location of Facilities • Transformer Location (Apartments)
Specifications (cont’d) • Location of Facilities • Transformer Location (Subdivision)
Calculations • Cost: Software-calculated • Fuse: No calculation needed • Cables & Conduits • Size: Software-calculated based on cable length and load • Length: Measured from map
Calculations (cont’d) • Cable Tension, ≤ 850 lbs. • Maximum Tension = 831 lbs. • Software-calculated
Calculations (cont’d) • Transformer Size (Apartments) Equation 1
Calculations (cont’d) • Transformer Size (Apartments) Calculated Total Load per Unit = 15.32 kVA Equation 2
Calculations (cont’d) • Transformer Size (Subdivision)
Project Summary • All requirements were met • MLGW and the customer approved the final design • Project is currently under construction