Naman Chopra Suan-Aik Yeo Ronny Wijaya Darin Tanaka. Alumoline Fuel-Cell Instrumentation. A.F.C.I. – Group 12. Safety & Reliability issues. Safety: Sensors do not mess the reactor Reliability: The battery’s output may fluctuate Regulator heats up Sensors’ signals accuracy
E N D
Naman Chopra Suan-AikYeo Ronny Wijaya Darin Tanaka Alumoline Fuel-Cell Instrumentation A.F.C.I. – Group 12
Safety & Reliability issues • Safety: • Sensors do not mess the reactor • Reliability: • The battery’s output may fluctuate • Regulator heats up • Sensors’ signals accuracy • No warning if SD card is not attached or full • Touch screen display on cold weather
Components that might fail • 36 to 12 Volts regulator, requires a heat sink • Sensors; conversion signals may not be accurate • Atom board • Touch screen may not be reliable on cold cond.
Steps to mitigate • Use the approved sensors • Provide enough heat sink • Make sure the physical connections are solid • Reduce noises on sensors with protective wires • Provide enough power to the Atom board • Operate system in an operating condition • Have a solid software quality