1 / 28

4 th MARCH 2011

Ashton Coal Operations Pty Limited. Community Consultative Committee Environmental Report. 4 th MARCH 2011. Ashton Monitoring Locations. Depositional Dust. Monitoring. Total Suspended Dust. Monitoring. PM 10 Dust – Site 1. Monitoring. Maximum daily limit 150 µg/m 3.

nash
Download Presentation

4 th MARCH 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ashton Coal Operations Pty Limited Community Consultative Committee EnvironmentalReport 4thMARCH 2011

  2. Ashton Monitoring Locations

  3. Depositional Dust Monitoring

  4. Total Suspended Dust Monitoring

  5. PM10 Dust – Site 1 Monitoring Maximum daily limit 150µg/m3

  6. PM10 Dust – Site 2 Monitoring Maximum daily limit 150µg/m3

  7. PM10 Dust – Site 3 Monitoring Maximum daily limit 150µg/m3

  8. PM10 Dust – Site 8 Monitoring Maximum daily limit 150µg/m3

  9. Blasting Statistics at 1st March 2011 63blasts have been fired for the reporting period to date.

  10. Rainfall Monitoring

  11. Water Sampling Locations Monitoring

  12. Water Quality - pH Monitoring

  13. Water Quality - pH Monitoring

  14. Water Quality - pH

  15. Water Quality - EC Monitoring

  16. Water Quality - EC Monitoring

  17. Water Quality - EC Monitoring

  18. Groundwater Sampling Sites Monitoring

  19. Groundwater – Standing Depth Monitoring

  20. Groundwater – Standing Depth Monitoring

  21. Groundwater – EC Monitoring

  22. Groundwater – EC

  23. Noise Monitoring Statutory noise monitoring was conducted in February 2011. There were no exceedences for the reporting period. Noise

  24. Complaints Community DECC Total complaints 4 – , Total enquiries - 0

  25. Complaints

  26. Environment Related Operation Changes

  27. Environment Related Operation Changes

  28. Any Questions? The End

More Related