Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet

Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet. Martin Winkler Kick-off meeting EU DS "DIRACsecondary-Beams", April 14-15, 2005, GSI, Darmstadt, Germany. The Pre-Separator of the Super-FRS Sub-Tasks of NUSTAR2 (Choice)

nasim-wong
Download Presentation

Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet Martin Winkler Kick-off meeting EU DS "DIRACsecondary-Beams", April 14-15, 2005, GSI, Darmstadt, Germany • The Pre-Separator of the Super-FRS • Sub-Tasks of NUSTAR2 (Choice) • Implementation Plan, Milestones & Deliverables • Project Resources and Budget Task leader of NUSTAR2: Gebhard Moritz, GSI Martin Winkler, Task7: NUSTAR2 15-4-05

  2. Design parameters and layout of the Super-FRS Design Parameters High-radiation area • Large phase space  large aperture magnets • High beam energies + large apertures •  high pole tip fields for quadrupols •  use superconducting magnets Martin Winkler, Task7: NUSTAR2 15-4-05

  3. Requirements of Magnetic Elements of the Preseparator Can the magnets stay superconducting after the target and beam dumps? PF2 1,3 Martin Winkler, Task7: NUSTAR2 15-4-05

  4. Beam dump locations in the 1st stage of the Pre-Separator Target Trajectories of primary beams with different DBr/ Brbeam Beam Dumps Light fragments The primary beam is always dumped in well-defined positions outside the magnets ! Martin Winkler, Task7: NUSTAR2 15-4-05

  5. Exploration of radiation load on magnets behind the high-power production target Projectile: 1500 MeV/u 238U 1012/s σx = 1.0 mm σy = 2.0 mm σp /p = 0.5% Energy deposition distribution (calculated with PHITS) Target: Carbon 4 g/cm2 Geometry Avarage energy depositionon on the coil surface: <DE>/M= 0.46 mJ/g (quench limit: 2-3 mJ/g) Heat load on the cryogenic system for a 5 ton quadrupole magnet: Expected FAIR cryogenic power: 20 kW ≈ 2.3 kW Martin Winkler, Task7: NUSTAR2 15-4-05

  6. Radiation sensitivity of coil materials and insulator Behind target and beam dump:Expected heat load ≈ 1 mJ/g  is equivalent to a dose rate of 1 Gy/s Assume 4000 h/year operation time  14 MGy accumulated dose  Ceramic insulation is required Martin Winkler, Task7: NUSTAR2 15-4-05

  7. Radiation resistant (normal-conducting) magnet Magnet Cross Section Parameter: B = 1.6 T I = 600 A J = 1.5 A/mm2 P = 50 kW ΔB/B ≈ 2×10-4 ΔR = ±20 cm Weights (12.5 m, 11°): Fe: 72 t Cu: 9.5 t Coil Cross Section Martin Winkler, Task7: NUSTAR2 15-4-05

  8. Conceptual design of a high-precision Survey and Alignment System for high-radiation areas of FAIR After commissioning of the SuperFRS a very high level of radiation is expected. S&A "as usual" will not be possible due to prohibited or limited access. No access of human personnel High demands on accuracy (some 1/10 of mm) Handling curved beamlines with a length up to 50 m "RALF" - Remote ALignment on the Fly Based on Photogrammetry non-contact high accuracy data capture within a shorttime Automated guided vehicle system Remotely controlled adjustment of accelerator components in cooperation with i3mainz Institute for Spatial Information and Surveying Technology Martin Winkler, Task7: NUSTAR2 15-4-05

  9. Multi-annual implementation plan for NUSTAR2 Martin Winkler, Task7: NUSTAR2 15-4-05

  10. Participating institutes in task7 (NUSTAR2) Martin Winkler, Task7: NUSTAR2 15-4-05

  11. Milestones and Deliverables of NUSTAR2 • Milestones • M7-1: Decision on insulating material, 10/2005* • M7-2: Delivery of model coil, 9/2006* • M7-3: Design and test for Surveying and alignment system • finished, 4/2007* • M7-4: Prototype Magnet delivered, 12/2007* • Deliverables • D13: Report on exploration of conductor and cable, 1/2006* • D14: Report on the model coil, 1/2007* • D15: Report on surveying and alignment system for high- • radiation areas, 7/2007* • D16: Report on design and construction of the prototype • magnet, 12/2007* Martin Winkler, Task7: NUSTAR2 15-4-05

  12. Summary of Project Resources and Budget of the DP NUSTAR The requested 589 k€ from the EU correspond to ≈ 41% of the overall EU request for the DP NUSTAR Martin Winkler, Task7: NUSTAR2 15-4-05