An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Renewable Energy @ ClosedLandfills Landfill Installation Considerations – Solar PV By: Gary Garfield, PE, LSP URS Corporation Salem, New Hampshire

  2. Landfills: An Underutilized Resource

  3. Typical Landfill Cap

  4. Flexible Installations

  5. Rigid Installation

  6. Rigid Installations

  7. Flexible vs. Rigid Panel Installation

  8. Factors to Consider • Racking Systems • Anchoring Systems • Side and Top Slopes • Settlement • Landfill Gas Extraction Equipment • Erosion and Vegetative Cover

  9. Racking Systems • Need to be elevated if installed on vegetative support layer • Need to be adjustable • Can be at grade if installed on stone layer

  10. Anchoring System • BallastSystem • Auger System

  11. Slope Considerations • 2% to 5% slopes preferred over 3:1 slopes • If placement is on side slope you need to consider slope stability • Static & Dynamic Loading • Snow and Ice loading • Side Slope Repairs • Side slope placement usually has less exposure time

  12. Settlement Consideration • Landfills are heterogeneous • Differential settlement will occur • Mitigation can include: • Use of geotextile or geonet reinforcement under stone dust or crushed stone • Use of Adjustable Racking Systems • Use of Shims

  13. Erosion Control • Changing the landfill surface changes surface water drainage capacity of: • Drainage Swales • Down Chutes • Mid-Slope Berms • Access Road Ditches • Toe Drains • Detention Basins

  14. Surface Cover • Crushed Stone • Kill vegetation • Apply geotextile • ¾ to 1 ½ inch stone • Grassy Cover • Mowing considerations • Insects • Healthy vegetative cover

  15. LFG System Considerations • LFG equipment maintenance • Subsurface LFG equipment includes • Header lines • Drip Legs • Blanket Drains • Sumps