190 likes | 433 Views
MUNICIPALLITY OF TIRANA May 6, 2014. ECONOMIC DEVELOPMENT AND STRATEGIC PROJECTS. ECONOMIC DEVELOPMENT AND STRATEGIC PROJECTS. Business Climate and Economic Development Fiscal incentives Regulatory Reform at Local Level General Urban Plan Grimshaw Master-plan Strategic Projects
E N D
MUNICIPALLITY OF TIRANA May 6, 2014 ECONOMIC DEVELOPMENT AND STRATEGIC PROJECTS
ECONOMIC DEVELOPMENT AND STRATEGIC PROJECTS • Business Climate and Economic Development • Fiscal incentives • Regulatory Reform at Local Level • General Urban Plan • Grimshaw Master-plan • Strategic Projects • TPTT(Tirana Public Transport Terminal) • LRT (tramway lines) • Integrated Management of Urban Waste • Other Projects on the pipeline • Tirana Industrial-Park • Tirana Lighting Project • Tirana Parking Strategy Project
BUSINESS CLIMATE AND ECONOMIC DEVELOPMENT • Reduction of more than 60 local taxes and tarrifs; • Fiscal incentives for all enterprises that employs more than 50 persons; • Installation of “One Stop Shop” in local level; • Reduction of number of documents required for different permits, licenses and authoratisations; • Counceling, B2B and start-up support;
TNBRP (Tirana Northern Boulevard and River Project) Grimshaw
Strategic Project TPTT
Strategic Project TPTT . • PPP scheme with an investment of 40 mln Euro; • Feasibility study done by “ITALFERR” with EBRD financial support; • IRR=16%, NPV= 76,13; • 11,3 mln passanger/yeartransiting terminal; • Concession tender will be launched on June, 2014.
Strategic Project Tirana LRT Line “East-West (Kinostudio-Kombinat), -length of8,4 km -approx. 90.000 pass/day.
Strategic Project Tirana LRT • PPP scheme; • Feasibility study done by “EGIS International” with FASEP (French Government) financial support; • IRR=12,6%, NPV=37,5; • 11,3 mln passanger/year transiting terminal; • Concession tender will be launched on June, 2014.
Strategic Project Integrated Management of Urban Waste (IMUW)
Strategic Project IMUW • Concession scheme with an investment of 25 mln Euro; • Feasibility study done by IFC; • IFC financialsupport and process consultation; • IRR=17%; • Concession tender will be launched on June, 2014.
Other Project Industrial-PARK • PPP scheme; • Location identified in General Urban Plan; • The feasibility Study and Business Plan” is prepared by “Environment Park” with “CapitalBalk” financial support; • IRR=15% at least.
Other Project Tirana Lighting Project
Other Project Tirana Lighting Project • The Tirana Lighting Project aims to: • Reduce Energy Consumption about 45%; • Improve Light Quality; • Improve Energy Efficiency (Reducing Energy Costs); • Improve Operation Efficiency (Reducing Maintenance Costs); • Reducing Carbon Footprint; • Infrastructure for the Future Digital City Management.
Other Project Tirana Parking Strategy Project
Other Project Tirana Parking Strategy Project • The Parking Strategy Project aims to: • Benefits as regards land use and location problems; • In many cases, underground space use results from a lack of surface space or location problems; • The construction costs of underground structures are generally higher than those of building in the open air but in dense area are necessary; • Improved traffic flow; • Improved road safety; • Reduced parking time; • Reduced atmospheric and noise pollution.
MUNICIPALITY OF TIRANA May 06, 2014 THANK YOU FOR YOUR ATTENTION!