An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BSC Panel 214 11 July 2013

  2. Report on Progress of Modification Proposals Adam Lattimore 11 July 2013

  3. Modifications Overview

  4. 214/04 P295 ‘Submission and publication of Transparency regulation data via the BMRS’ Talia Addy/Tariq Hakeem 11 July 2013

  5. P295 – Transparency Regulation Tariq Hakeem - National Grid

  6. P295 - Issue • Regulation No 543/2013 (Transparency Regulation) has come into force with an implementation date of 4th January 2015 • The regulation sets out a number of data items that Transmission System Operators (TSOs) have to submit for publication on Electricity Market Fundamental Information Platform (EMFIP) • National Grid as TSO will be required to submit data on behalf of primary data owners • P295 proposes that National Grid submits data to Elexon who then submit the data to EMFIP on behalf of GB • Consideration needs to be given to the interaction between outage data published under P295 and that published under P291

  7. P295 - Solution • National Grid submits a large amount of data to Elexon to support settlement arrangements - some of this data is published on the BMRS • P295 proposes that the information for publication on EMFIP is submitted to Elexon via the existing National Grid / Elexon data channels for onward submission to EMFIP • BSC parties may well derive value from the publication of some / all of this EMFIP data on BMRS

  8. P295 - Benefits • Submission of EMFIP data via Elexon would allow BSC parties to decide how much of the data should also be published on the BMRS, and in what formats etc • Changes to publication and formatting of this data will be under the governance of Elexon and could be amended more easily should BSC parties require it • Submission via Elexon also utilises existing data channel infrastructure

  9. P295 – Applicable Objectives • Better meets Applicable BSC Objective (c) – publication of data on BMRS would allow information to be more accessible to BSC Parties; and • Better meets Applicable BSC Objective (e) – P295 would deliver the legally binding regulation more efficiently as the data would use existing National Grid / Elexon data channels

  10. P295: Modification Proposal • Amend the BSC to allow ELEXON to be the GB data provider for all data that the Transmission Company is required to submit to the EMFIP under the Transparency regulation • Some or all of this data published on the BMRS

  11. P295: Things to Consider (1 of 2) • What information is required under the Transparency regulation? • What information should be published on the BMRS? • What are the obligations on submitting the information?

  12. P295: Things to Consider (2 of 2) • What changes are required to support the proposed solution? • Are there any alternative solutions? • What are the benefits against the Applicable BSC Objectives?

  13. P295: Proposed Progression • Recommend that P295 progresses to an Assessment Procedure • Recommend a four month Assessment Procedure • Three Workgroup meetings • 15WD Impact Assessment & 15WD Assessment Consultation • Assessment Report presented to Panel in November • Workgroup membership should include: • P291 & Issue 47 Workgroup members • SSMG members • Other relevant experts & interested parties

  14. P295: Recommendations The Panel is invited to: • DETERMINE that Modification Proposal P295 progresses to the Assessment Procedure; • AGREE the proposed Assessment Procedure timetable such that an Assessment Report should be completed and submitted to the Panel at its meeting on 14 November 2013; • DETERMINEthat the P295 Workgroup should be formed from members of the P291 and Issue 47 Workgroups and the Settlement Standing Modification Group, along with any other interested parties; and • AGREE the Workgroup’s Terms of Reference.

  15. 214/05 Request to raise a Modification; ‘Introduction of a ‘Fast Track’ Modification Process following the outcomes of the Code Governance Review (Phase 2) Claire Anthony 11 July 2013

  16. Code Governance Review Phase 2 • Aimed to enable other industry codes to benefit from the CGR Phase 1 outcomes • Final outcomes published 27 March 2013, along with a Statutory Licence changes consultation • Impact of CGR Phase 2 on BSC • Introduction of the new ‘Fast Track’ Self-Governance process • The Fast Track process would be used to correct any manifest errors and minor housekeeping changes

  17. Modification Proposal • The Issue: • In light of the final publication of the licence conditions, the new Fast Track Self-Governance process needs to be incorporated into the BSC by 31 December 2013 • Proposed Solution: • The BSC will be amended to introduce the Fast Track Self-Governance Modification Process

  18. Fast Track Process Proposer raises Fast Track Self Governance Modification Proposal presented to BSC Panel (Panel unanimously agree) (Panel disagree) Final Fast Track Self-Governance Report Treat either as: published on BSC Website a) Standard ‘Self-Governance’ Modification (15 WDS to object) b) Modification Proposal

  19. Proposed Progression • Recommend: Report Phase – APPROVE • Merits of Proposal are self-evident • The Modification Proposal will enable the quick progression and implementation of minor housekeeping changes to the BSC without the need to go through the full Modification process • Recommend: Implementation Date • 31 December 2013 in line with the changes to Standard Condition C3 of the Electricity Transmission Licence

  20. Applicable BSC Objectives • Modification Proposal better facilitates Applicable BSC Objectives • (a) The proposed changes will mean that the BSC is consistent with SLC C3 of the Licence; and • (d) The Modification Proposal will enable the progression and implementation of minor housekeeping changes • What are the Panel’s views on the Applicable BSC Objectives? • Are there any further questions that the Panel would like to ask as part of the Consultation?

  21. Recommendations We invite the Panel to • RAISEthe Modification Proposal in Attachment A • SUBMIT the Modification Proposal directly to the Report Phase • AGREE a provisional recommendation that the Modification should be made • AGREE a provisional Implementation Date of 31 December 2013 in line with the requirement in Standard Condition C3 of the Electricity Transmission Licence • AGREE the draft legal text in Attachment B • AGREE the draft redlined changes to BSCP40 in Attachment C and • AGREE that the Draft Modification Report should be issued for consultation and submitted to the Panel at its meeting on 12 September 2013

  22. 214/06 P283 ‘Reinforcing the Commissioning of Metering Equipment Processes’ Claire Anthony 11 July 2013

  23. P283: Issue • Panel raised P283 on recommendation of PAB • Technical Assurance of Metering Expert Group (TAMEG) and ELEXON concerns • Certain Metering Equipment usually not within Registrant/MOA control when commissioning required • Issues cause incomplete commissioning and records; and incorrect Meter readings (which can lead to significant error)

  24. P283: Proposed Solution (1 of 2) • Make Equipment Owner responsible for • Commissioning current transformers and voltage transformers • Providing relevant records to the Registrant • Two tier approach to obligations • If BSC Party – obligations would lie with the Equipment Owner (LDSO or Transmission Company) • If not a BSC Party – obligations would rest with the Registrant

  25. P283: Proposed Solution (2 of 2) • Require MOA to confirm status of HH Commissioning to Registrant • Metering Equipment commissioned in accordance with CoP4 or • Identified defects/omissions in commissioning of Metering Equipment • Require Registrant to assess and address identified issues • Act to resolve issues that constitute a risk to Settlement • Consult relevant participants and agree steps to address issues • Could include further commissioning of Metering System

  26. P283: Panel’s Initial Views (1 of 2) • Unanimous view that P283 would better facilitate: • Objective (b), because it would improve the accuracy of metered volumes which would promote effective operation of distribution systems • Objective (d), because data entering Settlement would be improved under the P283 arrangements; and • Objective (c), because competition would be improved by increased confidence in the Settlement and commissioning processes as a result of the P283 arrangements • Panel considered that the main benefits of P283 would be against Objectives (b) and (d), with marginal benefit against (c)

  27. P283: Panel’s Initial Views (2 of 2) • Unanimous support for • Implementation Date • 6 November 2014 (November 2014 BSC Release) if an Authority decision is received on or before 6 November 2013; or • The next BSC Release at least 12 months from the date the decision is received, if an Authority decision is received after 6 November 2013 • Legal text • CoP4 drafting

  28. P283: Report Phase Responses(1 of 2) • 12 responses to Report Phase Consultation • Unanimous support of • Modification • Applicable BSC Objectives • Panel’s initial recommendation to approve P283 • Implementation Approach

  29. P283: Report Phase Responses (2 of 2) • No comments were received on the BSC legal text • Several comments received on CoP4 redlining • Minor amendments consisting of further clarification and typographical errors, which have been incorporated into the CoP4 redlining • No new arguments put forward

  30. P283: Panel’s Final Recommendations • Panel invited to confirm its views that P283 would better facilitate Applicable BSC Objectives (b), (d) and (c)?

  31. P283: Recommendations (1 of 2) We invite the Panel to • NOTE the P283 Draft Modification Report and the Report Phase consultation responses • CONFIRM the recommendation to the Authority contained in the P283 Draft Modification Report that P283 should be made as it would better facilitate Applicable BSC Objectives (b), (d) and (c) • APPROVEan Implementation Date for P283 (if approved) of • 6 November 2014 if an Authority decision is received on or before 6 November 2013; or • If an Authority decision is received after 6 November 2013, the next BSC Release at least 12 months from the date the decision is received

  32. P283: Recommendations (2 of 2) • APPROVEthe BSC legal text and CoP4 redlining for P283; and • APPROVE the P283 Modification Report or INSTRUCT the Modification Secretary to make such changes to the report as the Panel may specify

  33. 214/07 P291 ‘REMIT Inside Information Reporting Platform for GB Electricity’ David Kemp 11 July 2013

  34. P291: Background & Issue (1 of 2) • REMIT requires market participants to publish inside information • Regulation does not explicitly set out what should be reported • Non-binding ACER guidance provides more detail • ACER expressed preference for using central reporting platforms • Participants can also use their own websites • But this can make it harder for participants to locate all information quickly

  35. P291: Background & Issue (2 of 2) • BMRS publishes and reports data relating to the BM, Settlement and the market in general • Info on BMRS not used in Settlement • BMRS website freely available to view by anyone • P291 proposed BMRS website as best place for a central REMIT platform for GB electricity market • Changes to BMRS reporting require changes to BSC

  36. P291: Proposed Solution • Central reporting platform will be placed on BMRS website • Considered ACER’s best practice example • Participants can submit messages via either the ELEXON Portal and/or existing Grid Code submissions • Grid Code route could only be used by Grid Code participants and only for outage-related information • Participants will be able to choose to use only one route if they wish • BSCCo and TC will forward messages received to BMRA for publication • Use of the platform would be voluntary

  37. P291: Panel’s Initial Views (1 of 2) • Unanimous: P291 would better facilitate Objectives (c) and (e) • Info on public platform means freely accessible to all (c) • Ancillary benefits from non-BSC Parties using platform (c) • Better facilitate compliance with REMIT (e) • Align with spirit of Objective (e) • Unanimous recommendation to approve P291

  38. P291: Panel’s Initial Views (2 of 2) • Unanimous Panel support for Workgroup’s proposed Implementation Date: • 31 December 2014 if approved on or before 31 March 2014 • Panel unanimously agreed draft legal text for Report consultation

  39. P291: Report Phase Responses (1 of 4) • Majority view that P291 should be approved • Would better facilitate Objectives (c) and (e) – agree with Panel’s views • May better facilitate Objective (b) (minority view) • Would be detrimental to Objective (d) (minority view) • But believes benefits against other Objectives outweighs this impact 1 of 2

  40. P291: Report Phase Responses (2 of 4) • One respondent has neutral view on P291 • Support principle of platform • Believe more holistic consideration needed with Transparency reg. (P295) • P291 raised to fix specific defect (REMIT platform) • Transparency reg. out of scope 2 of 2

  41. P291: Report Phase Responses (3 of 4) • Several comments received on legal text • Some amendments made to improve clarity

  42. P291: Report Phase Responses (4 of 4) • General agreement with Implementation Date • Welcome decision to align with Transparency regulation

  43. P291: Panel’s Final Recommendation • Panel invited to confirm its views that P291 would better facilitate Objectives (c) and (e) for the reasons previously given • Panel invited to consider the views put forward against Objectives (b) and (d)

  44. P291: Recommendations (1 of 2) ELEXON invites the Panel to: • NOTE the P291 Draft Modification Report and the Report Phase Consultation responses; • CONFIRM the recommendation to the Authority contained in the P291 draft Modification Report that P291 should be made as it would better facilitate Applicable BSC Objectives (c) and (e); [Continues]

  45. P291: Recommendations (2 of 2) • APPROVE an Implementation Date for P291 (if approved) of: • 31 December 2014 if an Authority decision is received on or before 31 March 2014; • APPROVE the BSC legal text for P291; and • APPROVE the P291 Modification Report or INSTRUCT the Modification Secretary to make such changes to the report as the Panel may specify.

  46. Minutes of Meetings 213 & Actions Arising Adam Richardson 11 July 2013

  47. Chairman’s Report BSC Panel Andrew Pinder 11 July 2013

  48. 214/01 ELEXON Report Peter Haigh 11 July 2013

  49. Distribution Report David Lane 11 July 2013

  50. National Grid Update Ian Pashley 11 July 2013