1 / 2

Integrated Test Successes March 10, 2010

Darlene Mosser-Kerner Developmental Test & Evaluation Deputy Director, Program Policy, Guidance and Assessment. Integrated Test Successes March 10, 2010. Integrated Test Successes (Data provided by AFOTEC).

nau
Download Presentation

Integrated Test Successes March 10, 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Darlene Mosser-KernerDevelopmental Test & EvaluationDeputy Director, Program Policy, Guidance and Assessment Integrated Test Successes March 10, 2010

  2. Integrated Test Successes(Data provided by AFOTEC) • Laser Joint Direct Attack Munition (LJDAM) Final Operational Utility Evaluation (OUE): Saved $1.43M and accelerated fielding 6 weeks • Joint Air-to-Surface Standoff Missile (JASSM) Reliability Operational Assessment: Saved $7.2M and 60 Days • A/OA-10C: Informed Fielding Decision and Supported 2007 AEF Deployment TDY savings • MQ-9 Reaper: Saved $600K and 7 Months • CV-22: Simultaneous training and testing $290K TDY savings • C-5 RERP OT&E Plan: Saved 3 months and reduced original test deployment footprint by 50% • Wideband Global SATCOM: Saved 10 months and $434K in test work hours • Space Based infrared System (SBIRS) Highly Elliptical Orbit 1: Accelerated USSTRATCOM/J65 Certification by 65 days

More Related