Pre-stressed Steel System Post Tensioned Slab Case Study: K- Financial Tower
BENEFITS • Less Columns • Less Beams • Thinner slabs • Controlled deflection • Flexibility of Layout & Services • Lighter Structure • Less Foundations • Less Rebars Less Workmanship • Better Durability • Quicker turn-around of the Formwork • Fast Construction • Cost Saving
Tendon Three-span post-tensioned beam V a 2 P cos P W B a a P P P For harped profile A 8P x sag w = For parabolic shape 2 L Free-body diagram of a tendon section between its low point (A) and point of inflection (B) Illustrative example • Illustrative
W Va Vd P P Free-body diagram of beam after removal of tendon Va Vd W P P Free-body diagram of tendon Force system between tendon and beam Illustrative example • Illustrative
Flat corrugated duct Strand position in a circular duct Bonded system tendon detail for beams & slabs BONDED • How it is bonded: • Bond is achieved throughout the length of the tendon by a cementitious matrix called grout • PT force along the tendon is a function of the deformation of the concrete
K - FINANCIAL TOWERS TYPICAL FLOORS
Execution By nominated local installation agent
SUMMARY OF POST-TENSIONING EXECUTION
POST-TENSIONING INSTALLATION • FORMWORK • SIDE-SHUTTER • FIXING OF ANCHORS • MARKING OF THE SLAB • TENDON INSTALLATION • PROFILING & FINISHING
CHECKING BEFORE THE CASTING • No. OF ANCHORS AND TENDONS • PROFILES • GROUT VENTS • BURSTING REINFORCEMENT • Additional Rebar (Bursting, Punching Shear) • PROPPING AND FORMWORK
CASTING • PROPER VIBRATION AROUND THE ANCHORS • CONCRETE TO BE PLACED WITHOUT DAMAGING THE TENDONS • PROPER CURING OF THE CONCRETE AFTER THE CASTING
STRESSING • REMOVE THE SIDE-SHUTTER • CRUSH CUBE FOR TESTING THE CONCRETE STRENGTH • START STRESSING TO 100% IF CONCRETE IS AT 25 MPA IN LESS THAN 3 DAYS • DO PARTIAL STRESSING IF REQUIRED • TAKE READINGS AFTER
APPROVAL • SEND STRESSING RECORDS TO THE P/T CONSULTANT FOR APPROVAL • CUT THE TAILS AFTER APPROVAL • FILL THE POCKETS • PREPARE FOR GROUTING
GROUTING • SHUTTER CAN BE REMOVED • ADEQUATE PROPPING TO BE PLACED • GROUTING OPERATIONS CAN START AT ANY TIME