120 likes | 238 Views
Brittany Murphy (PM, ECE) Christopher Tyra ( CpE ) Zachary Tennessen (ME) Dylan Hartman (ME) Nathaniel Sparks (ME) Rachel Parth (ME) Faculty Advisor: Professor Farhang. F11-76-MOWR Autonomous Lawnmower. Overview . Executive Summary Purpose - Rachel Responsibilities - Brittany
E N D
Brittany Murphy (PM, ECE) Christopher Tyra (CpE) Zachary Tennessen (ME) Dylan Hartman (ME) Nathaniel Sparks (ME) Rachel Parth (ME) Faculty Advisor: Professor Farhang F11-76-MOWRAutonomous Lawnmower
Overview • Executive Summary • Purpose - Rachel • Responsibilities - Brittany • Project Description - Nathaniel • Block Diagram - Christopher • Timeline - Dylan • Action Item List – Rachel • Resources Required – Zachary • Cost - Nathaniel • Summary - Christopher
Executive Summary • ION (Institution of Navigation) • Building Autonomous Lawnmower • GPS • Sensors • Robotics
Executive Summary • Programming/GPS –Christopher Tyra • Project Manager/Robotics –Brittany Murphy • Lawnmower/Electric Motor –Zachary Tennessen • Batteries/Power –Dylan Hartman • Frame/Previous Design Researcher –Nathaniel Sparks • Wheels/Motors/Sponsors –Rachel Parth
Project description • Fully Autonomous Lawnmower • 10 by 15 meter yard • Obstacles
Timeline • Week 1 – Verify parts • Week 4 – Frame fully constructed with mower and sensors attached • Week 7 – Programming completed • Week 14 – Design reports
Action item list • Verify parts • Construct frame • Test sensors with inputs and outputs • Program BASIC • Test entire project
Resources required • Ping Ultrasonic Distance Sensor & Mounting Bracket • Infrared Line Follower Kit • X-Band Motion Detector • Position Controller Kit • 30' of 1.5”x1.5”x0.125” Aluminum Square Tubing • PS-12550 • Swivel wheels • Motorized Rear Wheels with Controller • Lawnmower • GPS Receiver Module • Dell Studio XPS 1640 • BASIC Stamp Discovery Kit
Resources required In addition to the components already listed, the following will be needed: • Power Lab Space • Machine Shop Space • Electrical Supplies
Cost Total Cost On Market: $4,780.94 Current Total Cost for Project: $400.00