1 / 10

Barrel Modularity and Layout

Module #1. Module #2. Module #12. Cooling In. TTC, Data & DCS fibers. Opto. SC. DCS interlock. DCS env. IN. Cooling Out. SMC Hybrid. Service bus. PS cable. ~1.2m. MC. MC. MC. MC. MC. MC. Barrel Modularity and Layout. Comments:

necia
Download Presentation

Barrel Modularity and Layout

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Module #1 Module #2 Module #12 Cooling In TTC, Data & DCS fibers Opto SC DCS interlock DCS env. IN Cooling Out SMC Hybrid Service bus PS cable ~1.2m MC MC MC MC MC MC Barrel Modularity and Layout • Comments: • SMC is located at the stave/SM end and steer 24 hybrids • For Stave layout the service bus is running below the Si-wafers • and the front and back detector bias are separated • SMC is a hybrid board which integrates the opto, the GBT, the DCS and some power regulations • There are 2 SMCs par Stave/SM electrically separated from the top and bottom side

  2. Interlock Overview • Cooling Interlock: Power cut of the corresponding stave cooling loop •  Same scheme as the current SCT • Justification: Protection against cooling failure • Action: Interlock the LV and HV of the stave • Module Interlock: Disable local/global power •  Must be different scheme since PS is locally distributed • Justification: Protection against local excess heating (runaway or cooling contact pb) • Action: Interlock the LV and HV of the stave • NB: Scheme may be different for serial powering and DC-DC • SMC Interlock: Disable Power on SMC and on Stave • Justification: Protection against excess heating on SMC card • Action: Interlock the LV and HV of the stave

  3. SMC top DCS ADC & IR DCS on SMC  PP1  PS crate – Option 3 Top-side Stave Power-DCS cable Option 3 requires SMC top  SMC bottom 3 twisted pair/SMC Connector modularity opened 6 twisted and independent DCS/interlock lines PP1 SMC bot Bottom-side Stave Power-DCS cable 23 NTC lines + 1 line Ref To PS-DCS-Interlock Option 3 1 NTC 2 cooling NTCInterlock 3 env. (NTC) lines or 1 RH sensor

  4. Interlocks - Proposed scheme between Stave and PS Stave Supply / Reading – 2 twps PS Crate Cooling x2 I-box DCS Top side LV PS Top Modules SC-I LV PS Bot SMC HV PS Top X 12? Bottom side Modules SC-I HV PS Bot X 12? SMC Case of DC-DC scheme • NB: • Barrel SP scheme requires 4 LV PS (2 for SMC top & bot, 2 for modules top & bot) • Endcap SP scheme requires 8 LV PS (twice the barrel for better matching in efficiency) • Barrel HV may need up to 12 individual biasing channels per stave side – Not defined yet! • EC HV may need up to 9 individual biasin channels per petal side – Not defined yet!

  5. Combining Interlocks at PS crate – Serial Powering Top-side Stave Power-DCS cable PS Crate NTC-Mod (option3) NTC-Cooling I-box DCS NTC-SMC I-Cooling/Mod I-SMC-Bot I-SMC-Top LV Mod PS Top LV Mod PS Bot I-Modue Top LV SMC PS Top LV SMC PS Bot I-Modue Bot HV PS Top X 12? HV PS Bot X 12? Bottom-side Stave Power-DCS cable • Note that in that scheme it is proposed to get all the NTC-cooling interlock via the top SMC card • Reason is lo leave 3 twisted and independent lines for RH sensors (if needed)

  6. Module Interlock on SMC SC – Serial Powering OR OVER HEAT INTERLOCK REF +V +V GND GND GND GND GND 1 interlock signal/ super-module IC on SMC HYBRID Stave / SM REGISTER TRIPLE VOTE LOGIC + THRESHOLD from DAC with Triple vote logic D F/F NTC NTC NTC - NTC Enable DAC with Triple vote logic 1 2 3 24 CLEAR GBT DCS in ADC 1 ADC 12bits multiplexed RESISTORS REF Asic either with GBT SCA or separated

  7. Combining Interlocks at PS crate – DC-DC (option 1) Top-side Stave Power-DCS cable PS Crate NTC-Mod (option3) NTC-Cooling I-box DCS NTC-SMC I-Cooling/Mod I-SMC-Bot I-SMC-Top LV PS Top LV PS Bot HV PS Top X 12? HV PS Bot X 12? Case of DC-DC scheme Bottom-side Stave Power-DCS cable • NB: Module interlock is steered locally on the stave ( No action on HV): • Either on the SMC where all the LV stave side is interlocked • Or on the MC where each hybrid interlock is steered locally – Interlock the supply on the FE

  8. Module Interlock on Hybrid – DC-DC (option 1) +V GND FE FE FE FE Integrated into MCC + 2.5V FE FE Threshold DAC FE FE NTC + FE FE temp FE FE - GND FE FE Module Interlock FE FE FE FE D F/F En/Dis Interlock From DAC FE FE Clear En/Dis DC-DC From DAC MCC-DCS & Interlock En/Dis DC-DC Stage1 DC-DC Stage 1 En/Dis +2.5V +12V

  9. Combining Interlocks at PS crate – DC-DC (option 2) Top-side Stave Power-DCS cable PS Crate NTC-Mod (option3) NTC-Cooling I-box DCS NTC-SMC I-Cooling/Mod I-SMC-Bot I-SMC-Top LV PS Top I-Modue Top LV PS Bot HV PS Top X 12? I-Modue Bot HV PS Bot X 12? Module interlock inputs for LV and HV at PS crate Bottom-side Stave Power-DCS cable Same module interlock scheme as serial powering

  10. Summary • The interlock scheme is dependent upon the powering option: • Consequence at the PS crate  more LV for serial powering and for Endcap + SP • Serial Powering have to use and depend upon a DCS chip on the SMC card for the module interlock and survey • DC-DC may use MC DCS to steer locally on the hybrid the temperature interlock NB: Using the GBT-SCA link on the SMC may lead to additional hardware design at the BOC  Slow Control Manager

More Related