An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Radio & Plasma Wave Instrument (RPWI) Team Meeting • RPWI Documentation • Twiki home page (secure) • http://space.irfu.se/twiki/bin/view • Register! • JgoRpwi group • Only IRF-Uppsala team members can edit (may change) • All RPWI documentation will by time be stored here • RPWI Public Outreach page Who? Jan-Erik Wahlund, RPWI Meeting (Prague), Feb. 18-19, 2010

  2. ESA EJSM WS

  3. EJSM/JGO S/C(EJSM WS, January, 2010) • Mass: • Incl. 20% system design • Dry: ≈1500 kg, Total: 4400 kg • P/L: 104 kg (incl. margin), 120-150 W • Power: • GaAs cells >60 m2 • Notes: • High Temp MLI on S/C external surface during Venus flybys • Nadir pointing during flybys, except during communication periods • TM: • Ka band • Ganymede circular phase most constraining, > 1 Gbit/day

  4. EJSM project schedule

  5. EJSM/JGO Mission Profile • Launch: 2020 (to sync with JEO) • Arrival: 2026 with a VEEGA • Cruise: 6 years • JOI: A Ganymede GA before JOI • 13 x 230 RJ orbit • 165 +120 days, Δv ≈ 887 m/s • Callisto Science Phase (57+400 days) • Resonant orbit with Callisto (15 flybys) • Both poles, 2.5-2.6 km/s • Ganymede approach & orbit phase • To Ganymede orbit with CaGaGa-GA (85 days) • All flybys near 200 km • Elliptical Orbit: 200 x 10000 km, 141.8° (120 days) leading to 1000 km near circular orbit at end • Cicular Orbit: 200 km (180 days) • 1h eclipses foreseen • Impact Ganymede

  6. P/L Operations

  7. SSR antenna use (RA-PWI) • Agreement for passive use • With Lorenzo Bruzzone (SSR lead) • Details to be settled March 11, Trento

  8. Radiation issues • Design requirement (new!) • 85 krad behind 10 mm Al • Design should aim for 150 krad tolerance • Concern: Requirement keep changing • Shielding mass • ESA estimates 80 kg shielding for 104 kg P/L (confirmed) • ≈ 3 kg for RPWI • Radiation control • ESA will most probably implement a Radiation Control Board • Suggestion: L. Åhlén from RPWI

  9. Radiation test facilities • in Uppsala • Co60 1-10 Rad/min • Electrons, 7.5-15 MeV High dose rate • Protons, 20-180 MeV 150 Rad/min • Protons, < 6 MeV Low dose rate • Heavy ions

  10. Planetary Protection

  11. JGO Requirements • COSPAR • Maintains a planetary protection policy • Has a dedicated planetary protection panel • ESA & NASA • Has planetary protection policies compliant with COSPAR • Mission lead agency has overall responsibility (ESA for JGO)

  12. Category II: Of significant interest relative to the process of chemical evolution & origin of life, but only remote chance that contamination by S/C could compromise future investigations.

  13. Procedures for Category II • ESA may consider bio-burden control for H/W • Dry heat microbial reduction (DHMR)? • Only penetrator (if selected)? • Recommended scope for bio-burden control • Assembly, testing and launch in ISO 8 clean-room condition • Transport in clean boxes in between • Perform biological assays during H/W final assembly • Assess temperature/time profiles of manufacturing processes, especially for items behind radiation shielding • 5h at 125°C reduce by an order of magnitude • Use test program & approved parts list • Estimate reduction based on agreed bio-burden levels, inactivation rate and S/C radiation dose mapping

  14. Documentation/Reviews RPWI probably need a dedicated person for Planetary Protection Control Who?

  15. Again for RPWI: Who?

  16. Funding situation (IRF-Uppsala + KTH) • February 1: Applied for two years to SNSB • TDA:s as well as Management • LP-PWI mechanics • Radiation facilities upgrade • Radiation testing • ASIC development activities • MEMS WLP pre-amps for LP-PWI • Planetary protection activities • Cost outlined until 2030 (!)

  17. LP-PWI pre-amps development • MEMS Wafer Level Packaged (WLP) technlogy • 5x5x1 mm3, 1g, 10g with 8 mm shielding • Compare PCB, 3x5x2 cm2, 300g with 8 mm shielding • 4 units means ≈ 1.2 kg mass saving • Ångström Microtech AB • MEMS WLP is TRL 6 • No problem reach TRL 5 pre-amps by end of 2012 • Could also be applied to HF pre-amps if wanted

  18. Pre-amp house (LP-PWI) From M. Dobrowolski & J. Grgorczuk (Warzaw)

  19. HF Receiver /Analyzer

  20. HF Rx/Analyzer • Iowa University group is prime • IRFU is looking into how LESIA may participate • Sorry, cannot say more for the moment.