Training for the 2013 Construction and Material Specifications. Office of Construction Administration Gary Angles, Administrator. Introduction, Overview and Implementation Schedule. Focus of this training will be to:. Introduce the 2013 C&MS

neila
Download Presentation

Training for the 2013 Construction and Material Specifications

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Training for the 2013 Construction and Material Specifications Office of Construction Administration Gary Angles, Administrator

  2. Introduction, Overview and Implementation Schedule Focus of this training will be to: • Introduce the 2013 C&MS • Describe the significant changes with a focus on the changes that may require design consideration

  3. Introduction, Overview and Implementation Schedule • The 2013 C&MS was published 12/31/2012 • Associated documents published 12/31/2012: • Proposal Notes • Supplemental Specifications • Supplements • Associated documents published 1/18/2013: • Standard Construction Drawings • L&D Manual updates

  4. Introduction, Overview and Implementation Schedule • The most significant changes were made in: • Items 603, 604 were replaced by Item 611 • (To be covered by Becky, and Gary) • For all Concrete items, replace Class C, S, F • with QC-1, QC-2, QC-Misc • (To be covered by Craig, and Jim)

  5. Introduction, Overview and Implementation Schedule Currently all documents, including the Item Master are available on the internet Conversion guidelines: www.dot.state.oh.us/Divisions/Engineering/CaddMapping/cms_conversion/Pages/2013_CMS_Conversion_Page.aspx Item Master: www.dot.state.oh.us/Divisions/ContractAdmin/Contracts/Construction/Forms/ItemMaster.aspx C&MS, PN, SS, S: www.dot.state.oh.us/Divisions/ConstructionMgt/OnlineDocs/Pages/ProposalNotesSupplementalSpecificationsandSupplements.aspx Please note that all projects with an award date of 12/23/2013 (sale date of 12/12/2013) or after must be converted to the 2013 C&MS with no exceptions.  The first SS800 for the 2013 C&MS will be dated 4/19/2013 The last SS800 for the 2010 C&MS will be dated 7/19/2013

  6. Introduction, Overview and Implementation Schedule Todays Agenda:

  7. Questions • Gary Angles, Administrator Office of Construction Administration • Gary.Angles@dot.state.oh.us • www.dot.state.oh.us/Divisions/ConstructionMgt/Pages/default.aspx • 614-466-7075