330 likes | 856 Views
NTPC in Solar. NTPC’s 5 MW Solar project at Port Blair, Andaman and Nicobar. NTPC’s 260 MW Solar project at Bhadla , Rajasthan. Solar Power in NTPC. Surinder Raina , Executive Director(RE). 24.01.18. ISA meet, Rohini , New Delhi. 1. Outline. Renewable Energy in India
E N D
NTPC in Solar NTPC’s 5 MW Solar project at Port Blair, Andaman and Nicobar NTPC’s 260 MW Solar project at Bhadla, Rajasthan Solar Power in NTPC Surinder Raina , Executive Director(RE) 24.01.18 ISA meet, Rohini, New Delhi 1
Renewable Energy in India Installed capacity (Renewables)-62.0 GW (31.12.17) SMALL HYDRO – 8 % (4.5 GW) SOLAR- 26 % (16.2 GW) WIND – 52% (32.8 GW) BIOMASS – 14.0 % (8.5 GW) Small Hydro < 25 MW Source: MNRE
Renewable Energy in India Growth of Solar PV in India YEARLY CUMULATIVE CAPACITY(MW) 16.2 GW as on 31.12.17 Status as on 31st March of the Year
Renewable Energy in India Massive Capacity Addition Program by 2022 Today 62 GW 2022 175 GW
Renewable Energy in NTPC Planning for Diversified Growth Today 51.4 GW 2032 130 GW NTPC poised to be 130 GW company by 2032
Renewable Energy in NTPC Solar Power Capacity Addition plan NTPC to Develop 10 GW of RE projects under Green Energy Commitment to GOI TWO PRONGED APPROACH EPC MODE DEVELOPER MODE
NTPC Ltd Commissioned Capacity - 870 MW
NTPC Ltd Solar Capacity addition (MW) MW
NTPC Ltd Anantapuramu Solar Project -I 250 MW(5 x 50 MW) DOMESTICALLY MANUFACTURED CELLS AND MODULES ARE USED April 2015 April 2016 Transformation from barren land to 250 MW in 1 year time LOCATION : ANANTAPURAMU ULTRA MEGA SOLAR PARK(AP) EPC AGENCIES – TATA(100 MW), LANCO(50 MW), BHEL(50 MW), S&W(50 MW)
NTPC Ltd Bhadla Solar Power Project-260 MW( 4 x 65 MW) DOMESTICALLY MANUFACTURED CELLS AND MODULES ARE USED Mar 2016 Mar 2017 LOCATION : BHADLA SOLAR PARK(RAJASTHAN) EPC AGENCIES – VIKRAM SOLAR (2 X 65 MW), JAKSON(65 MW), TATA(65 MW)
NTPC Ltd Mandsaur Solar Project-250 MW( 5 x 50 MW) DOMESTICALLY MANUFACTURED CELLS AND MODULES ARE USED DOMESTICALLY MANUFACTURED CELLS AND MODULES USED June 2017 Mar 2016 LOCATION : NEEMUCH AGAR SOLAR PARK(MP) EPC AGENCIES – LANCO(2 X 50 MW), VIKRAM SOLAR ( 50 MW),BHEL(50 MW), TATA(50MW)
NTPC Ltd EPC Projects Under Tendering – 478 MW
NTPC Ltd Future Projects- 1330 MW
NTPC Ltd Solar Power Projects with BESS in A&N ChidiyaTapu(8MW) Manglutan(17 MW) NIT done on 20.10.16 NIT done on 08.10.16 NIT done on 20.10.16 • MOU signed with A&N for Development of 50 MW Solar Projects • Tendering was done for 25 MW Solar plant with BESS including transmission system. • In Oct-17 as per discussions with MNRE the above tenders have been annulled. • During recent review by MoSP on 10.01.18, it was decided that NTPC should float 25 MW Solar project at two locations alongwith Battery Back up for catering to intermittencies. BESS : Battery Energy Storage System
NTPC Ltd 5 MW existing Solar plant at Andaman-BESS Solar Power Generation profiles from SCADA Normal Day Cloudy
NTPC Ltd Future projects- Under discussions with States
Solar Projects under Developer Mode
NTPC Ltd Solar Projects under Developer Mode National Solar Mission Phase II Batch II -15000 MW TRANCHE-1 :3000MW
NTPC Ltd Solar Projects under Developer Mode Other Developer Mode Projects being pursued • 250 MW Solar Project for NDMC • 750 MW Solar Project at Anantapuramu, AP • Bidding of 20,000 MW Solar projects as per MNRE directive
New Initiatives • For reducing cost • For Increasing Competition
NTPC Ltd New Initiatives- Tendering • Evaluation on Cost/MU Basis • Bidder has flexibility to choose • Higher DC to AC Ratios • Centralised/String Inverter • Crystalline Silicon/Thin film Module • E bidding with Reverse Auction • Multiple Packaging • O&M period in the scope of EPC agency extended from 5 to 15 years
NTPC Ltd New R&D Initiatives- Floating Solar(Kayamkulam) • Salient Details: • Floating platform developed indigenously in collaboration with (CIPET, Chennai) • 100 kW Floating PV installed at Kayamkulam in Mar-17 • Benefits • Water Conservation through reduced evaporation • Increased generation due to cooling effect on panels • Requires lesser installation time than land mounted solar. NTPC plans for MW scale floating solar
NTPC Ltd New R&D Initiatives- Dry Cleaning System • Salient Details: • Self Powered • Self auto Cleaning • Remotely operated • Benefits : • No use of water • Improved generation as soiling loss are minimized because of daily cleaning Installed in NTPC Dadri Solar plant(5MW) -4 MW with Dry Cleaning System • 1 MW with Wet Cleaning System
NTPC Ltd New R&D Initiatives- Solar Wind Hybrid at Kudgi 2 MW Wind (37% CUF) + 1.7 MW High Efficiency Solar PV (>19%) • Maximization of Generation from a piece of land ( 200 x 150 M) • Development of Control for Solar and Wind Curtailment • Optimum Size storage Integration for Smoothening • First Such Plant In India, will help Policy framework
NTPC Ltd New R&D Initiatives- Solar-CW Channel at Mouda • Objective • Design of Low Cost replicable • optimized solar structures. • Identifying most suitable stretch of canal • for economic Power • Comparison study rooftop & Canal top • Configuration of Mouda • CW Channel Length: 280 meters • PV Plant size : 150 KW • The Side wall of Channel will act as load bearing members for Solar Structure Commissioned in June-17
NTPC Ltd New R&D Initiatives- Solar Thermal Hybrid at Dadri • Salient Details: • Solar Field : 15 MW thermal • Solar Conversion efficiency : 24.39% • Additional output : 3.66 MW electrical • Coal Saving : 3250 MT/year Under Implementation
NTPC Ltd Key Issues • Falling tariff of solar projects • Different schemes of GOI resulting in differential tariffs. • Uncertainty in imposition of antidumping/safeguard duty. • Difficulties in signing PPA with State Discom • Availability of land for setting up large capacity solar projects • Integrated development of Solar park and Solar project • Availability of Adequate water supply for washing
People,Power,Planet–in Harmony THANK YOU THANK YOU NTPC Limited ( A Government of India Enterprise) www.ntpc.co.in