MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE
MICE • Cost/Efficiency of the Neutrino Factory • Cannot be done without a demonstration of ionisation cooling; • Essential for a muon collider • Accelerator aperture is a strong cost driver • Ionisation cooling reduces transverse beam emittance • MICE = Cooling Channel Demonstration
The Neutrino Factory p+ m+ + nm m+ ne + nm + e+ Factor of 10 in performance Decay USA Europe Japan
MICE m Detectors SC-Solenoid Cryogenic Absorber RF -Cavities Diffuser EU design study 44/88 MHz; US design study 201 MHz MICE Reproduces part of study II channel: 201 MHz Bz • to design, engineer, and build a section of cooling channel capable of giving the desired performance for a Neutrino Factory; • to place this apparatus in a muon beam and measure its performance in a variety of modes of operation and beam conditions.
RF Module Overview SC Coil
Baseline specification • 201 MHz • 8 cavities in 2 modules • Each cavity is isolated by Be windows • In principle each cavity is independent (f,f) • Cavities operated in a magnetic field ~few T • 4 cavities replace energy lost in one absorber • ~10 MV/m DE~10 MeV • >1 MW power per cavity • Pulse duty cycle ~ 1:1000 (1ms/1s)
Solutions • Cost estimate for MICE ~£3M for 8MW • MICE Strategy: • 201 MHz typical on (old) linacs • ISIS, CERN, LBNL, Los Alamos, BNL, KEK! • 2x2MW amplifiers from LBNL (at DL) • 2x2MW amplifiers from CERN • 3x300kW amplifiers from LBNL • Power supplies promised by Los Alamos • Procure missing parts
LBNL Circuits TH170 amplifier
4616 driver & test stand Burle willing to refurbish/ make 4th
Master Oscillator Controls etc Los Alamos CERN HT Supplies 300 kW Amplifier 300 kW Amplifier 300 kW Amplifier 300 kW Amplifier 2 MW Amplifier 2 MW Amplifier 2 MW Amplifier 2 MW Amplifier HT Supplies LBNL ASTeC 201 MHz Cavity Module 201 MHz Cavity Module
ISSUES for MICE R&D • Old Tubes • Future supply uncertain • 116 ex ISIS • 170 ex CERN • 4616 still available • Output power levels • limitations of circuits • 8 Cavities fed from 4 amplifiers • Cavity interactions, reflected power, stability • Circulators • Hybrids
MICE Tasks • Refurbishing & Recommissioning existing kit • Procure missing items • New • In house build • Beg, borrow (steal held in reserve) • Aim to assemble at least one complete system as a test stand over next two FYs • Future task • 4 power systems/8 cavities • MICE potential test bench for power sources
Effect of Stong Magnetic Fields • RF dark currents were measured at Fermilab on 805 MHz cavities in magnetic field • Extrapolation to 201 MHz uncertain • tests on 201 MHz prototype 2005 • Environmental issue for MICE