1 / 17

Grattan Healy

Grattan Healy. MnaG Workshop Presentation. Tullamore Court Hotel 17th May 2013. Contents. Objective and scope of ‘ Embedding Sustainability ’ study Authors Methods and constraints Main findings Conclusions Action Plan. Objective of Study. BUILD THE BUSINESS CASE FOR SMALL WIND ENERGY

nerita
Download Presentation

Grattan Healy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Grattan Healy • MnaG Workshop Presentation Tullamore Court Hotel 17th May 2013

  2. Contents • Objective and scope of ‘Embedding Sustainability’ study • Authors • Methods and constraints • Main findings • Conclusions • Action Plan

  3. Objective of Study BUILD THE BUSINESS CASE FOR SMALL WIND ENERGY (defined as between 500kW and 20MW scale)

  4. Scope of Study • Wind in Ireland - the context • Small scale wind energy - current status • Winds of change - policy and technology developments • Challenges - various obstacles to small scale wind • Opportunity - potential future for small scale wind • Way Forward - supportive policies and actions

  5. Authors Prepared by: consulting engineers with extensive wind energy experience (Jennings O’Donovan) Supported by: economics consultant (EPEC) grid consultants (Mullan Grid) tax specialists (Porter & Co)

  6. Methods and constraints • Summary of Ireland’s energy status, based primarily on SEAI data • Project financial modelling based on extensive experience, ranging from 500kW to 50MW • Financial viability comparison • Economic comparison between fossil & wind generation • Qualitative analysis of benefits of small wind energy • Policy analysis, with input from Meitheal na Gaoithe • But, funds not available for full cost benefit analysis

  7. Main findings 1. Wind is cheaper than fossil in all scenarios

  8. Main findings 2. Small wind has a natural cost disadvantage

  9. Main findings 3. But small wind brings natural technical advantages • Benefits of embedded small wind generation to power system include: • Reduced losses • Deferral of network investment • Smart grid technology • Improved utilisation of existing network capacity • Improved generation control to provide necessary system ancillary services • Small wind can provide these benefits in ways large wind farms can’t

  10. Main findings 4. Small wind also brings natural economic advantages • The economic benefits of small wind energy projects include: • Additional income to rural landowners • Benefits in kind • Community benefit schemes • New jobs • Indirect sources of income • Local ownership of shares in the project • Potential for community-owned energy projects

  11. Mainfindings 5. The current process for wind projects is tortuous

  12. Conclusions • Small wind helps social acceptance, delivers sustainable communities • But, current process for wind energy projects is unfit for purpose • Grid access is the major source of cost & risk • Consequently, it can take 15 years or longer to deliver a wind project • Incentives undercut by other measures - curtailment damages REFIT • Wind projects have free fuel but high CAPEX, so harder to finance • Small wind is half of current capacity and fundamentals are good • But it is endangered because of misaligned policy, targets at high risk

  13. Action Plan 1. • Transparency of electricity bills to be improved by the CER • Planning Forum to be established with input from wind industry • Reassess legislation setting thresholds for EIAs for wind farms • Finance to adjust EII reliefs for wind projects • Discussions with EIB on a specific fund for small wind projects

  14. Action Plan 2. • Transpose Article 13, RE Directive to reduce administrative barriers • Curtailment and constraint to be compensated fully at REFIT price • Three year time limit on grid connection from application, for projects with planning, where connection financed by its owner • Support scheme automatic on achieving planning & grid connection • Consistent County Wind Strategy Plans & standardization of scope & methodologies of environmental studies by all Local Authorities

  15. Publication Report and Annexes fully completed Limited number of copies printed for policy makers and stakeholders Launch planned to coincide with Global Wind Day, June 15th Report and Annexes will be put on Meitheal na Gaoithe website then Considering ‘Print on Demand’ service, to enable interested parties to purchase printed version directly online

  16. Persistenceaccording toCalvin Coolidge Nothing in the world can take the place of Persistence. Talent will not; nothing is more common than unsuccessful men with talent. Genius will not; unrewarded genius is almost a proverb. Education will not; the world is full of educated derelicts. Persistence and determination alone are omnipotent. The slogan 'Press On' has solved and always will solve the problems of the human race.

  17. Thank you Study and Annexes will be available soon at: www.mnag.ie

More Related