1 / 6

UK CAA/FOCA/FAA BASA/SIP Status Report to JAR-STD AB, December 2003

UK CAA/FOCA/FAA BASA/SIP Status Report to JAR-STD AB, December 2003. Mark Dransfield UKCAA. UKCAA/FOCA – FAA BASA SIP Meetings. 5 meetings held to date January 2003 Atlanta May 2003 Atlanta July 2003 Washington September 2003 Gatwick November 2003 Washington. Objectives.

neva
Download Presentation

UK CAA/FOCA/FAA BASA/SIP Status Report to JAR-STD AB, December 2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UK CAA/FOCA/FAA BASA/SIP Status Reportto JAR-STD AB, December 2003 Mark Dransfield UKCAA

  2. UKCAA/FOCA – FAA BASA SIP Meetings • 5 meetings held to date • January 2003 Atlanta • May 2003 Atlanta • July 2003 Washington • September 2003 Gatwick • November 2003 Washington

  3. Objectives • To update the existing BASA/SIPs between the FAA and UK CAA , Swiss FOCA to reflect changes to… • Qualification standards • Evaluation procedures • Include initial as well as recurrent evaluations • Produce updated Model SIP and SIP working plan for other NAAs use • To ease the current logistically impossible burden of required inspections of USA based TRTO corporate and business jet simulators

  4. What has been done • SIP Phase 1 System Familiarisation Documents • Drafts compiled and exchanged • Comparison documents produced • AC120-40B & JAR-STD 1A Ammd 2

  5. FAA/JAA NAA Comparison Documents Produced • Simulator General Requirements • Evaluation Procedures • Objective Tests • Functional & Subjective Tests • These differences will be used as a reference in determining the special conditions to be listed in the revised Simulator Implementation Procedures documents.

  6. Schedule to Completion • Revision of SIP agreements. • The FAA will track the revisions to the SIP documents and, after the special conditions are completed and agreed to by the authorities, prepare individual revised SIP for signature with the FOCA and the UK CAA by JUNE 2004

More Related