Task 160 May Status Report Shicheng HU, MCC 07 May, 2001 TP-010134 MCC
Task 160 (TTCN) - Funding • Completion of all contracts for the received 3GPP 2001 funding (26 mm) for the 1 half of this year. • PCG acknowledged the needs from TSG-T for the funding shift from FY 2002 to FY 2001 and approved the request. • A call for the TTCN voluntary contributions has been circulated within the SDOs (ref. ETSI CL 2083). • Answer deadline set to end of May, • 6 mm of the voluntary funding from Motorola received, • The remaining need for the 2nd half of 2001 will be funded by the shifted funding. • For the further spending request for TTCN project during FY2002 and 2003, requested budget (58mm with 50% extra allowance) will be discussed in October.
Progress & Measures • Progress in TTCN draft • 400 TTCN test cases available in 34.123-3 v.102, • 60 new GMM test cases drafted, • TTCN for SS control largely updated in accordance with ASP update v.102 (RAB reconfiguration, security & DL channel power control) . • During Feb. – May, 3 TTCN experts were available. • Considering high CR volume in the core spec, two experts allocated for the TTCN maintenance. • Warning: the goal for 460 TTCN test cases in June will NOT reached. (estimated 410). • In order to maintain the Sept. goal to approve 34.123-3, additional 3-4 experts will be started soon. Their result is expected in August. • L2 (MAC, PDCP & BMC) tests, • Multi-cell TTCN tests (RRC measurement and idle mode), • SMS over PS.