LT2 & Stage 2 Compliance taking the right steps at the right time ( part 1 of 2)

LT2 & Stage 2 Compliance taking the right steps at the right time ( part 1 of 2). Jan C. Routt Jan Routt & Associates, LLC 3636 Timberwood Lane Lexington, KY 40515 859-971-0858 office 859-537-7750 mobile jroutt@alltel.net email Janroutt.com website. LT2 Plan or bin classification due.

neveah
Download Presentation

LT2 & Stage 2 Compliance taking the right steps at the right time ( part 1 of 2)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LT2 & Stage 2 Compliancetaking the right steps at the right time(part 1 of 2) Jan C. Routt Jan Routt & Associates, LLC 3636 Timberwood Lane Lexington, KY 40515 859-971-0858 office 859-537-7750 mobile jroutt@alltel.net email Janroutt.com website

  2. LT2 Plan or bin classification due Stage 2 IDSE Plan or report due LT2 & Stage 2 Implementation Schedule * Graphic adapted from EPA 2009 2010 2012 2013 2006 2007 2008 2011 2014 2015 2016 Possible Extension Crypto monitoring Treatment Installation 1 IDSE Review submission Compliance Possible Extension Crypto monitoring Treatment Installation 2 Review submission IDSE Compliance Crypto monitoring Treatment Installation Possible Extension 3 Review submission IDSE Compliance Compliance (if Crypto Monitoring) Possible Extension E. coli Crypto monitoring 4 Treatment Installation IDSE Review submission Compliance (if no Crypto Monitoring) 2009 2010 2012 2013 2006 2007 2008 2011 2014 2015 2016 * Includes associated consecutive systems

  3. 40 CFR 141.2 New Definitions • Combined distribution system (CDS) – Interconnected distribution system consisting of the distribution system of wholesale systems and consecutive systems that receive finished water. • Consecutive system – PWS that receives some or all of its finished water from one or more wholesale systems. • Wholesale system – PWS that treats source water as necessary to produce finished water and then delivers some or all of that finished water to another PWS. • Finished water – Water introduced into the distribution system of a PWS intended for distribution and consumption without further treatment, except as necessary to maintain water quality in the distribution system.

  4. IDSE/Stage 2 Wholesale System 100,000 Wholesale and Consecutive System 10,000 Consecutive System 50,000 Treatment Plant System A System B System C LT2 R i v e r Treatment Plant LT2 River Subpart H (SW or GWUDI) systems could end up on different schedules for LT2 source monitoring and IDSE/Stage 2 disinfection byproduct monitoring and treatment implementation Adapted from EPA

  5. LT2 –SW & GWUDI source testing and treatment • Source Crypto levels to be tested • Establish schedule & options • Grandfather, test or agree to treat • If source testing is required: • Set up with lab & other staffing resources • Submit schedule & location (deadline for largest systems already passed—consecutive system issues apply) • Electronic monthly reporting to EPA required for all but smallest systems • Remember E.Coli & turbidity testing too. • Treatment to be determined • If more treatment expected –look ahead at Microbial Toolbox options • Optimize existing processes (sources, pre-sed, filtration) • Evaluate alternatives Photos: LWC Cryptosporidium analysis

  6. Siting & Collecting the Samples Photo & Graphics adapted from (LWC & EPA): Source Water Monitoring Guidance Manual for Public Water Systems for Final LT2ESWTR -- Feb 2006 and KY & TN Consecutive System Case Study Scenarios (KYTN WPC July 2006) • Locate the sample site appropriately • Upstream of chemicals or recycle • Consider multiple sources, seasonal sources • Sample collection • (on scheduled date + or- 2 days) • 10-plus liters of water transported to lab • Or sampler filters 10-plus liters • Reality Check—practice

  7. Calculating Crypto Levels & LT2 Bin Assignments One crypto detect can make the Bin/Treatment -> $$$ • >0.075 oocyst/L = Bin 2 (more treatment required) • Treatment (Toolbox) options interim and long term • Optimize filtered turbidity using Partnership for Safe Water Phase III & Phase IV goals Highest 12 month average: 11 non-detects (zeros) plus one detect at 0.85 oocyst/L 0.85/12 months = 0.075 oocysts/Liter BIN 2