SABIC’s Mega Projects Outlook. 2006-2010. Table Of Contents: - Project listing - Production quantities - Project Details - Manpower Requirement - Related Opportunities. SABIC Projects 2006-2010. $12.0 Billion. SABIC Projects 2006-2010. $13.9 Billion. Production Increases for 2006-2010.
E N D
SABIC’s Mega Projects Outlook 2006-2010
Table Of Contents:- Project listing - Production quantities - Project Details - Manpower Requirement - Related Opportunities
SABIC Projects 2006-2010 $12.0 Billion
SABIC Projects 2006-2010 $13.9 Billion
Production Increases for 2006-2010 • Olefin Crackers - 4150 kta • Polyethylene (L/LDPE/HDPE) - 3000 kta • Polypropylene - 1250 kta • EO/Ethylene Glycols - 2570 kta • PVC/VC Monomers - 1000 kta • Methanols - 5000 tpd • Ammonia/Urea - 6550 tpd • O2/N2 Separation Plants - 9600 tpd • MMA - 150 kta • Iso Octane - 400 kta • PET - 720 kta • PTA - 180 kta • Butene 1 - 125 kta • BTX - 250 kta Plus Other Downstream Plants
Project Cost Breakdown Equipment & Bulk Materials 15.0 12.5 10.0 Field Construction Cost in $ Billions 7.5 Engineering & Management $13.5B 5.0 $7.7B 2.5 $4.7B 0
Equipment Estimate by Weights Exchangers/Coolers 132,000 metric tons Pumps 20,000 metric tons Compressors 25,000 metric tons Tanks & Vessels 135,000 metric tons Columns/Reactors 193,000 metric tons Package Equipments 4,000 metric tons Total Estimated Weight of Equipments – 509,000 Metric Tons
Estimate of Major Bulk Materials Piping 8,900,000 meters Various diameters and material type Building/Architectural 70,000 square meters Admin/control/lab/others Civil/concrete 2,100,000 cubic meters Different class type Structural Steel 570,000 metric tons Heavy, medium, light steel Electrical Cables 16,000,000 meters Various diameters and material type Paint/Insulation 3,700,000 square meters Various coating materials Instrument Cables 12,600,000 meters Various diameters and material type
Construction Cost HVAC $70 Million Mechanical $930 Million Structural $610 Million Piping $2,550 Million Total Cost $7,700 Million Civil $1,620 Million Electrical $930 Million Paint /Insulation $380 Million Instrument $610 Million
Engineering & Management Services Average Peak Engg. 5,600 men - 2007 6000 5000 4000 Engineering Services Average Man-Year 3000 2000 Average Peak Mgmt 1,500 men - 2007 1000 Project Management Services 0 2005 2006 2007 2008 2009 2010 Calendar Year
Construction 60000 51,000 Ave. Man (July-Sep 07) 50000 40000 Average Man - Quarter 30000 Construction -Under Devt 20000 Construction -On going 10000 0 2006 2007 2008 2009 2010 April 2006 - Dec 2010 2007 2008 2009 2010
Engineering Piping Chemical Process Civil Electrical Mechanical HVAC/Fire fighting Safety and Security Project Management Construction Engineering and Management Service Centers Materials Local Manufacturing (e.g. Gaskets, pre-cast concrete, steel structures, switch panels ... Etc Manpower Supervision Skill Enhancement Higher Education Craftsmen/Tradesmen Schools Related Opportunities
Infrastructure Health care Housing Commercial Centers Communication/Satellite Service Providers Portable Offices Service/Repair Workshops and Centers Family Centers Hotels Logistics Heavy/Light Lift Equipments Customs Clearance & Expediting Services Chemical Cleaning & Treatments Tools Rental Inspection Services Quality Controls Testing Related Opportunities ( Continues……)